Back to kitchen remodel contractors
B & B Construction
- Based in
- San Francisco
- On San Francisco permits
- Sep 2000 to May 2025
- Last 24 months
- 1 permit filed
40 permits since 2000: 35 completed, 1 in progress, 2 never finaled, 2 expired or cancelled.
Of the 2 never-finaled permits, 2 are 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
14 kitchen remodel permits: 14 completed. Typically 0 days from filing to permit and 340 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 10, 2017 | Completed final sign-off Sep 2018 | 714 Bay St | kitchen/bath remodel; no walls to be moved.Details
kitchen/bath remodel; no walls to be moved. | $25,000 |
| Nov 6, 2015 | Completed final sign-off Aug 2016 | 80 Crestline Dr | unit #1: remodel kitchen & bath.Details
unit #1: remodel kitchen & bath. | $19,000 |
| Jul 7, 2015 | Completed final sign-off Sep 2018 | 716 Bay St | one kitchen and one bath remodel. no wall to be altered or moved.Details
one kitchen and one bath remodel. no wall to be altered or moved. | $25,000 |
| Aug 6, 2014 | Completed final sign-off Aug 2015 | 80 Crestline Dr | apt #8. kitchen & bath remodel. no walls moved, removed or added. all fixtures and appliances layouts to remain unchanged.Details
apt #8. kitchen & bath remodel. no walls moved, removed or added. all fixtures and appliances layouts to remain unchanged. | $18,000 |
| Aug 6, 2014 | Completed final sign-off Jun 2015 | 80 Crestline Dr | apt #10. kitchen & bath remodel. no walls moved, removed or added. all fixtures and appliances layouts to remain unchanged.Details
apt #10. kitchen & bath remodel. no walls moved, removed or added. all fixtures and appliances layouts to remain unchanged. | $18,000 |
| Nov 22, 2013 | Completed final sign-off Dec 2014 | 80 Crestline Dr | #4: kitchen and bath remodel apt #4 only, no change of wall windows and door.Details
#4: kitchen and bath remodel apt #4 only, no change of wall windows and door. | $18,000 |
| Sep 11, 2013 | Completed final sign-off May 2015 | 80 Crestline Dr | kitchen and bathroom remodelDetails
kitchen and bathroom remodel | $18,000 |
| Jul 17, 2012 | Completed final sign-off Aug 2013 | 135 Dellbrook Av | revision to pa# 201205231083. revise kitchen plan @ ground floor. relocate existing water heater & (e) furnace at 1st floor. install new washer/dryer at 1st floor. repair dryrot at exterior wall.Details
revision to pa# 201205231083. revise kitchen plan @ ground floor. relocate existing water heater & (e) furnace at 1st floor. install new washer/dryer at 1st floor. repair dryrot at exterior wall. | $3,000 |
| May 23, 2012 | Completed final sign-off Aug 2013 | 135 Dellbrook Av | remodel kitchen, remodel bathroom, high efficacy lightingDetails
remodel kitchen, remodel bathroom, high efficacy lighting | $18,000 |
| Dec 2, 2011 | Completed final sign-off Apr 2012 | 80 Crestline Dr | #12- remodel kitchen & bathroom, no change on walls and opening.Details
#12- remodel kitchen & bathroom, no change on walls and opening. | $18,000 |
| Dec 2, 2011 | Completed final sign-off Mar 2012 | 80 Crestline Dr | #11- remodel kitchen & bathroom, no change on walls and opening.Details
#11- remodel kitchen & bathroom, no change on walls and opening. | $18,000 |
| Jun 17, 2011 | Completed final sign-off Aug 2011 | 80 Crestline Dr | replace kitchen cabinets, relace bath tub, relocate circuit panel out of closetDetails
replace kitchen cabinets, relace bath tub, relocate circuit panel out of closet | $9,000 |
| Jun 17, 2011 | Completed final sign-off Sep 2011 | 80 Crestline Dr | unit #3-replace kitchen cabinets, bath tub. relocate circuit panel out of clsoetDetails
unit #3-replace kitchen cabinets, bath tub. relocate circuit panel out of clsoet | $18,000 |
| Dec 6, 2010 | Completed final sign-off Aug 2011 | 716 Bay St | replace 9 windows like existing. not visable from street, tile kitchen & bathroom floor, resurface hardwood floors, no egress windows.Details
replace 9 windows like existing. not visable from street, tile kitchen & bathroom floor, resurface hardwood floors, no egress windows. | $3,000 |