B A Builders Inc
- Based in
- San Francisco
- On San Francisco permits
- Aug 2019 to Oct 2020
- Last 24 months
- 0 permits filed
3 permits since 2000: 2 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
2 stairs permits: 2 completed. Typically 82 days from filing to permit and 386 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 17, 2020 | Completed final sign-off Mar 2022 | 254 Harvard St | 2nd floor construct interior staircase. ground floor add 2 storage rooms and full bathDetails
2nd floor construct interior staircase. ground floor add 2 storage rooms and full bath | $40,000 |
| Aug 2, 2019 | Completed final sign-off Oct 2020 | 2632 Anza St | reconfigure extg garage level: floor plans to include: 1) adding 2 bedrooms at the garage level. 2)adding 2 bathroom at the garage level. new stairs between entry level and garage level. replace kitchen at entry level.Details
reconfigure extg garage level: floor plans to include: 1) adding 2 bedrooms at the garage level. 2)adding 2 bathroom at the garage level. new stairs between entry level and garage level. replace kitchen at entry level. | $120,000 |