Back to bathroom remodel contractors
Axis Construction
- Based in
- Hayward
- On San Francisco permits
- Mar 2001 to Dec 2025
- Last 24 months
- 24 permits filed
507 permits since 2000: 388 completed, 10 in progress, 59 never finaled, 50 expired or cancelled.
Of the 59 never-finaled permits, 6 are 3 to 5 years old, 16 are 5 to 10 years old, 37 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
4 bathroom remodel permits: 4 completed. Typically 0 days from filing to permit and 148 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 25, 2022 | Completed final sign-off Feb 2023 | 2919 Pacific Av | #10: hall bathroom repairs & replace shower. remove toilet & vanity. replace shower pan, surround & door, floor cover, paint. washer / dryer: relocate water supply in hallway. repair fan. new drywall. master bathroom: repairs/ replace tub/shower . new shower surround, tub & tile. reconf plumbing.Details
#10: hall bathroom repairs & replace shower. remove toilet & vanity. replace shower pan, surround & door, floor cover, paint. washer / dryer: relocate water supply in hallway. repair fan. new drywall. master bathroom: repairs/ replace tub/shower . new shower surround, tub & tile. reconf plumbing. | $47,671 |
| Mar 5, 2021 | Completed final sign-off Sep 2021 | 3045 Jackson St | repair master bath and hallway due to water damage. no exterior work. no walls changed. repair floor finish.Details
repair master bath and hallway due to water damage. no exterior work. no walls changed. repair floor finish. | $20,000 |
| Jun 23, 2016 | Completed final sign-off Aug 2016 | 8 Woodland Av | r/r bathroom tiels, install new water barrier. all tile like for like, no alterations.Details
r/r bathroom tiels, install new water barrier. all tile like for like, no alterations. | $25,000 |
| Feb 2, 2012 | Completed final sign-off May 2012 | 3133 Sacramento St | repair dry rot to framing to resemble existing @ 2 bathroom in both units. no change to walls, windows, doors or remodel of bathroom.Details
repair dry rot to framing to resemble existing @ 2 bathroom in both units. no change to walls, windows, doors or remodel of bathroom. | $25,000 |