Axa Construction
- Based in
- Daly City
- On San Francisco permits
- Jun 2019 to Apr 2026
- Last 24 months
- 8 permits filed
110 permits since 2000: 87 completed, 3 in progress, 15 never finaled, 5 expired or cancelled.
Of the 15 never-finaled permits, 6 are 3 to 5 years old, 9 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
2 stairs permits: 1 completed, 1 in progress. Typically 72 days from filing to permit and 303 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 12, 2025 | Completed final sign-off Aug 2026 | 263 Hale St | garage level: add bedroom and bathroom at rear. add space under kitchen to bedroom as new study. floor in that study to be located to 7'-6" minimum ceiling height. new stair to garden and up to upper level with new deck in front of facade. upper level: new bedroom & primary suite with 3/4 bath.Details
garage level: add bedroom and bathroom at rear. add space under kitchen to bedroom as new study. floor in that study to be located to 7'-6" minimum ceiling height. new stair to garden and up to upper level with new deck in front of facade. upper level: new bedroom & primary suite with 3/4 bath. | $185,000 |
| Aug 21, 2025 | In progress issued Dec 2025 | 257 Hale St | remove int. stair and fill in floor. remodel (e) bath as primary bath, add closet. add second bath. add slider door trim (n) kitchen to patio. enlarge (e) opening to living room and add (n) opening from hallway to kitchen . repair ext. siding at rear. add family room at g/f. remove skylight & infillDetails
remove int. stair and fill in floor. remodel (e) bath as primary bath, add closet. add second bath. add slider door trim (n) kitchen to patio. enlarge (e) opening to living room and add (n) opening from hallway to kitchen . repair ext. siding at rear. add family room at g/f. remove skylight & infill | $50,000 |