Back to kitchen remodel contractors
Avonmore Construction Inc
- Based in
- Novato
- On San Francisco permits
- Jul 2015 to Aug 2021
- Last 24 months
- 0 permits filed
29 permits since 2000: 19 completed, 9 never finaled, 1 expired or cancelled.
Of the 9 never-finaled permits, 9 are 5 to 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
13 kitchen remodel permits: 7 completed, 5 never finaled, 1 expired or cancelled. Typically 56 days from filing to permit and 260 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 16, 2021 | Never finaled issued Mar 2021, no final | 676 Greenwich St | remodel of kitchen one bathroom in kind, new kitchen cabinets and plumbing fixtures. replace washer and dryer and dishwasher. new lighting of existing j box locations. no exterior work. no changes in unit size. replace water heater. no change in layout of walls and openings.Details
remodel of kitchen one bathroom in kind, new kitchen cabinets and plumbing fixtures. replace washer and dryer and dishwasher. new lighting of existing j box locations. no exterior work. no changes in unit size. replace water heater. no change in layout of walls and openings. | $65,000 |
| Feb 5, 2021 | Completed final sign-off Oct 2021 | 1945 Washington St | unit 201 - remodel kitchen in-kind; repair shettrock inside kitchen; remodel 2 bathrooms in-kind and repair sheetrock inside bathrooms; repaint unit & install laminate flooring. no new wall & no (e) wall remolation. new lighting shall comply with cec 150.0 (k) 3 & (k) 5Details
unit 201 - remodel kitchen in-kind; repair shettrock inside kitchen; remodel 2 bathrooms in-kind and repair sheetrock inside bathrooms; repaint unit & install laminate flooring. no new wall & no (e) wall remolation. new lighting shall comply with cec 150.0 (k) 3 & (k) 5 | $40,000 |
| Jan 4, 2021 | Completed final sign-off Sep 2021 | 555 14th Av | kitchen & bathroom remodel, change 4 street facing windows, same location/sizeDetails
kitchen & bathroom remodel, change 4 street facing windows, same location/size | $34,000 |
| Sep 12, 2020 | Expired or cancelled withdrawn Mar 2021 | 676 Greenwich St | unit #674 on 2nd level: new bedrooms & bathroom. new kitchen cabinets & plumbing fixtures. new washer/dryer & dishwasher. new lighting at (e) j-box locations. replace hot water heater. no exterior work/fire alarm/sprinkler work. structural calc provided.Details
unit #674 on 2nd level: new bedrooms & bathroom. new kitchen cabinets & plumbing fixtures. new washer/dryer & dishwasher. new lighting at (e) j-box locations. replace hot water heater. no exterior work/fire alarm/sprinkler work. structural calc provided. | $65,000 |
| Feb 11, 2020 | Completed final sign-off May 2021 | 2321 Scott St | renovation of 1 apt - units 01 on 2nd fl. convert studio into 1-bedrm unit, new kitchen cabinets & plumbing fixtures, new washer/dryer & dishwasher, new lighting at (e) j-boxes. no change to mech, no exterior work, fire alarm or sprinkler. structural dwgs & calcs provided.Details
renovation of 1 apt - units 01 on 2nd fl. convert studio into 1-bedrm unit, new kitchen cabinets & plumbing fixtures, new washer/dryer & dishwasher, new lighting at (e) j-boxes. no change to mech, no exterior work, fire alarm or sprinkler. structural dwgs & calcs provided. | $65,000 |
| Oct 15, 2019 | Never finaled issued Jan 2020, no final | 428 Oak St | renovation of 1 apartment:units 428 on 1st floor. new finishes, new bathroom, nw kitchen cabinets, plmg fixtures.nw washer/dryer & dishwasher. nw lighting at extg j boxes locations. no exterior work, no fire alarm, sprinkler work. structural drawings provided.Details
renovation of 1 apartment:units 428 on 1st floor. new finishes, new bathroom, nw kitchen cabinets, plmg fixtures.nw washer/dryer & dishwasher. nw lighting at extg j boxes locations. no exterior work, no fire alarm, sprinkler work. structural drawings provided. | $65,000 |
| Oct 1, 2019 | Completed final sign-off Jan 2021 | 2110 Jackson St | unit 403 renovation on 4th level. (n) kitchen cabinets and plumbing fixtures, (n) washers/dryers, (n) dishwashers, (n) bedroom & bathroom, (n) lighting at (e) j-boxes. no change to mechanical. no exterior work, fire alarm or sprinkler work.Details
unit 403 renovation on 4th level. (n) kitchen cabinets and plumbing fixtures, (n) washers/dryers, (n) dishwashers, (n) bedroom & bathroom, (n) lighting at (e) j-boxes. no change to mechanical. no exterior work, fire alarm or sprinkler work. | $65,000 |
| Sep 27, 2019 | Never finaled issued Mar 2020, no final | 275 Grattan St | unit 9, 4th fl - new bedroom and bathroom, new kitchen cabinets and plumbing fixtures. new washer/dryer, new lighting at (e) j-boxes. no change to mechanical. no exterior, fire alarm, sprinklerDetails
unit 9, 4th fl - new bedroom and bathroom, new kitchen cabinets and plumbing fixtures. new washer/dryer, new lighting at (e) j-boxes. no change to mechanical. no exterior, fire alarm, sprinkler | $65,000 |
| Sep 11, 2019 | Completed final sign-off Oct 2020 | 1935 Jefferson St | unit 201: renovation of 1 apartment, unit 201. new bath, washer dryer, dishwasher, new kitchen. new plumbing fixt. new lighting at e jbox locatoin. no change to mech. no exterior work. no fire alarm or sprinkler workDetails
unit 201: renovation of 1 apartment, unit 201. new bath, washer dryer, dishwasher, new kitchen. new plumbing fixt. new lighting at e jbox locatoin. no change to mech. no exterior work. no fire alarm or sprinkler work | $65,000 |
| Jun 21, 2019 | Never finaled issued Jul 2019, no final | 619 Marina Bl | renovation of existing kitchen & powder room.Details
renovation of existing kitchen & powder room. | $75,000 |
| Apr 11, 2019 | Never finaled issued Jun 2019, no final | 675 Ofarrell St | units 5 & 19. renovation of 2 apartments. studios to 1 bed / 1 bath. (n) kitchen cabs, plumbing, fixtures, dishwashers, w/d's, lighting at (e) jboxes. change to mech, exterior, fire alarm or sprinklers. no structural work.Details
units 5 & 19. renovation of 2 apartments. studios to 1 bed / 1 bath. (n) kitchen cabs, plumbing, fixtures, dishwashers, w/d's, lighting at (e) jboxes. change to mech, exterior, fire alarm or sprinklers. no structural work. | $55,000 |
| Dec 26, 2018 | Completed final sign-off Jul 2021 | 1766 Greenwich St | remodel an extg bathroom and add an outdoor kitchen to an extg roof deck. provide new skylight per plans.Details
remodel an extg bathroom and add an outdoor kitchen to an extg roof deck. provide new skylight per plans. | $35,000 |
| Apr 24, 2018 | Completed final sign-off Nov 2018 | 2837 Sacramento St | renovation of master bath & another full bathroom. upgrade to kitchen, new stair to lower level, refinishing of previous unfinished lower level including flooring, insulation and drywall. structural work at lower level & at rear wallDetails
renovation of master bath & another full bathroom. upgrade to kitchen, new stair to lower level, refinishing of previous unfinished lower level including flooring, insulation and drywall. structural work at lower level & at rear wall | $50,000 |