Back to kitchen remodel contractors
Aviv Construction Inc
- Based in
- Richmond
- On San Francisco permits
- Jul 2020 to Sep 2026
- Last 24 months
- 2 permits filed
6 permits since 2000: 4 completed, 2 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
2 kitchen remodel permits: 1 completed, 1 in progress. Typically 49 days from filing to permit and 266 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 1, 2026 | In progress issued May 2026 | 3987 19th St | in kind kitchen remodel removal of built in living room in kin window replacementDetails
in kind kitchen remodel removal of built in living room in kin window replacement | $200,000 |
| Jul 10, 2023 | Completed final sign-off Jul 2024 | 75 Alviso St | remodel kitchen. replace all cabinets & appliances. convert rear study room into breakfast nook. remove existing wall between study & kitchen. extend/ enlarge rear deck and replace exterior stairs. convert front area of master bedroom into walk-in-closet.Details
remodel kitchen. replace all cabinets & appliances. convert rear study room into breakfast nook. remove existing wall between study & kitchen. extend/ enlarge rear deck and replace exterior stairs. convert front area of master bedroom into walk-in-closet. | $58,000 |