Back to kitchen remodel contractors
Avetex Construction Inc
- Based in
- Rio Linda
- On San Francisco permits
- Feb 2023 to Feb 2023
- Last 24 months
- 0 permits filed
1 permit since 2000: 1 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
1 kitchen remodel permit: 1 completed. Typically 3 days from filing to permit and 358 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 24, 2023 | Completed final sign-off Feb 2024 | 55 Ora Wy | unit# 202: kitchen cabinets to be installed, stone countertop to be installe, 14 recessed lights to be installed. paint the unit. bathroom tile to be installed. no tub removal, tub remain preexisting. paint the bathroom change the vanity at preexisting place, chnage the ptrap. new stone countertopDetails
unit# 202: kitchen cabinets to be installed, stone countertop to be installe, 14 recessed lights to be installed. paint the unit. bathroom tile to be installed. no tub removal, tub remain preexisting. paint the bathroom change the vanity at preexisting place, chnage the ptrap. new stone countertop | $9,000 |