Back to kitchen remodel contractors
Avalon Construction Co
- Based in
- San Francisco
- On San Francisco permits
- May 2003 to Mar 2019
- Last 24 months
- 0 permits filed
101 permits since 2000: 69 completed, 16 never finaled, 16 expired or cancelled.
Of the 16 never-finaled permits, 3 are 5 to 10 years old, 13 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
10 kitchen remodel permits: 7 completed, 3 expired or cancelled. Typically 0 days from filing to permit and 184 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 5, 2017 | Completed final sign-off Feb 2019 | 585 Haight St | to comply with nov: 201404381; items 10-28, nov 200671966; items 20,25,27,28, nov 201762741 partial, 201528531. remoodel of (e) apt. kitchen & bathrooms will be modernized. new furnace closet & laundry closet will be addedDetails
to comply with nov: 201404381; items 10-28, nov 200671966; items 20,25,27,28, nov 201762741 partial, 201528531. remoodel of (e) apt. kitchen & bathrooms will be modernized. new furnace closet & laundry closet will be added | $100,000 |
| Oct 12, 2016 | Completed final sign-off Feb 2019 | 579 Haight St | to comply with nov 200671108 items 1-23 & nov 201404391 - interior remodel of unit 579 haight, 3rd & 4th floors. kitchen & 2 baths will be remodeled with new cainets, fixtures and finishes. laundry closet will be added at 4th floor. 2 windows will be added at 4th floor bedrm. lighting will be upgradDetails
to comply with nov 200671108 items 1-23 & nov 201404391 - interior remodel of unit 579 haight, 3rd & 4th floors. kitchen & 2 baths will be remodeled with new cainets, fixtures and finishes. laundry closet will be added at 4th floor. 2 windows will be added at 4th floor bedrm. lighting will be upgrad | $100,000 |
| Apr 29, 2014 | Expired or cancelled expired Nov 2017 | 730 Excelsior Av | replace new faucet & sink in kitchen & bathroom, install two 92) gfic electrical receptacles.Details
replace new faucet & sink in kitchen & bathroom, install two 92) gfic electrical receptacles. | $1,500 |
| Apr 17, 2008 | Expired or cancelled expired Mar 2013 | 745 Buchanan St | kitchen renovation, entrance door repair and men's restroom renovation.Details
kitchen renovation, entrance door repair and men's restroom renovation. | $100,000 |
| Mar 19, 2007 | Completed final sign-off Sep 2007 | 1910 Palou Av | kitchen remodel electrical wk, bath rm remodel elecircal & plumbingDetails
kitchen remodel electrical wk, bath rm remodel elecircal & plumbing | $15,000 |
| Mar 9, 2007 | Completed final sign-off Jul 2007 | 818 Portola Dr | kitchen: remove and replace all appliances, remove & replace counter/countertop/cabinets, build an island, bathroom: one bathroom on mezz. level remodeleing, remove and replace toilet and sink, install a new shower.Details
kitchen: remove and replace all appliances, remove & replace counter/countertop/cabinets, build an island, bathroom: one bathroom on mezz. level remodeleing, remove and replace toilet and sink, install a new shower. | $25,000 |
| Mar 7, 2007 | Completed final sign-off Feb 2008 | 1250 Quesada Av | (n) bathroom, (n) kitchen, (n) toilet room, (n) chair lift.Details
(n) bathroom, (n) kitchen, (n) toilet room, (n) chair lift. | $75,000 |
| Aug 2, 2006 | Completed final sign-off Oct 2006 | 355 Tara St | kitchen remodeling, replace/remove kitchen equipments and cabinets, countertop and kitchen floor.remove/replace 4 windows, all in kind, 1 facing street. repair 2 skylights leaks, repair only. exterior painting.Details
kitchen remodeling, replace/remove kitchen equipments and cabinets, countertop and kitchen floor.remove/replace 4 windows, all in kind, 1 facing street. repair 2 skylights leaks, repair only. exterior painting. | $30,000 |
| May 11, 2006 | Completed final sign-off Oct 2006 | 2582 47th Av | remodeling: entry (floor tile & paint), new doors, upgrade garage- 1 hr. wall. (e) downstair room to office space including new french door & new bathroom. upstair-remodel kitchen, bathroom. plumbing & electric upgrade to bldg. code.foundation work to open wall & new french door.Details
remodeling: entry (floor tile & paint), new doors, upgrade garage- 1 hr. wall. (e) downstair room to office space including new french door & new bathroom. upstair-remodel kitchen, bathroom. plumbing & electric upgrade to bldg. code.foundation work to open wall & new french door. | $70,000 |
| Mar 3, 2006 | Expired or cancelled revoked Oct 2006 | 2955 26th St | remove kitchen in the basement & convert full bath to half bath @ ground floor. comply with nov# 200565040.Details
remove kitchen in the basement & convert full bath to half bath @ ground floor. comply with nov# 200565040. | $5,000 |