Augusto Carlos Torres
- Based in
- Sacramento
- On San Francisco permits
- Jul 2000 to Oct 2012
- Last 24 months
- 0 permits filed
20 permits since 2000: 15 completed, 2 never finaled, 3 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
6 stairs permits: 5 completed, 1 expired or cancelled. Typically 0 days from filing to permit and 8 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 3, 2010 | Completed final sign-off May 2010 | 3901 19th St | back of building wood stairs: replace sections of (e) 4x4 dryrotten upholder posts (2 or 3), replace last top 5 stepsfly and (3) 2x6 to landing railing. less than 50%Details
back of building wood stairs: replace sections of (e) 4x4 dryrotten upholder posts (2 or 3), replace last top 5 stepsfly and (3) 2x6 to landing railing. less than 50% | $2,500 |
| Dec 17, 2009 | Completed final sign-off Dec 2009 | 268 Surrey St | foundation walls mudills bolted down with 5/8 x 10" bolts at 3' oc. south wall mudsill dryrot section of 20' replaced with 2x6 pt bolted down with same and drypacked. front and back stair railing up 4" clearance. back stair landing boards replaced. 2 steps pt in kind no structuralDetails
foundation walls mudills bolted down with 5/8 x 10" bolts at 3' oc. south wall mudsill dryrot section of 20' replaced with 2x6 pt bolted down with same and drypacked. front and back stair railing up 4" clearance. back stair landing boards replaced. 2 steps pt in kind no structural | $5,750 |
| Dec 1, 2006 | Completed final sign-off Dec 2006 | 306 Bartlett St | stair at back of bldg. extg wood structure to be repair as follow. remove 2 flys running sections and replace them with same layout 8" risers and 9" runs. replace 2 main wood posts 4"x4"x18' at new concrete piers casting in place. replace some landings 2x6 boards and under it 2x6 joists extg railingDetails
stair at back of bldg. extg wood structure to be repair as follow. remove 2 flys running sections and replace them with same layout 8" risers and 9" runs. replace 2 main wood posts 4"x4"x18' at new concrete piers casting in place. replace some landings 2x6 boards and under it 2x6 joists extg railing | $7,200 |
| Dec 5, 2005 | Completed final sign-off Dec 2005 | 306 Bartlett St | comply w/nov3200564221. repair front stair <50%.Details
comply w/nov3200564221. repair front stair <50%. | $4,000 |
| Dec 11, 2003 | Completed final sign-off Dec 2003 | 58 Marston Av | build new wood stairs to replace already removed one on ex stairwell from ground garage floor to theDetails
build new wood stairs to replace already removed one on ex stairwell from ground garage floor to the | $4,600 |
| Sep 6, 2001 | Expired or cancelled expired Jan 2002 | 3973 17th St | back stairs: 3 stringers lamination w/ 2x12x10'0" to existing w/ 3/8 carrier bolts @ 3 flights. replDetails
back stairs: 3 stringers lamination w/ 2x12x10'0" to existing w/ 3/8 carrier bolts @ 3 flights. repl | $1,500 |