Back to kitchen remodel contractors
Atrisco Construction
- Based in
- Santa Rosa
- On San Francisco permits
- Mar 2021 to Feb 2025
- Last 24 months
- 1 permit filed
4 permits since 2000: 1 completed, 1 in progress, 2 never finaled.
Of the 2 never-finaled permits, 2 are 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
1 kitchen remodel permit: 1 in progress. Typically 21 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 4, 2025 | In progress issued Feb 2025 | 501 Crescent Av | revision to approved pa # 2021-0317-6756 add 3 (n) bathrooms, relocate the kitchen & reconfigure interior walls. rear yard design. change window frame material from aluminum to fibrex. change wall finish stucco to hardie architectural panel. no change to the exterior envelope, total sq ft orDetails
revision to approved pa # 2021-0317-6756 add 3 (n) bathrooms, relocate the kitchen & reconfigure interior walls. rear yard design. change window frame material from aluminum to fibrex. change wall finish stucco to hardie architectural panel. no change to the exterior envelope, total sq ft or | $23,100 |