Atlas Roofing Bay Area
- Based in
- Newark
- On San Francisco permits
- Oct 2023 to Jun 2026
- Last 24 months
- 69 permits filed
86 permits since 2000: 82 completed, 2 in progress, 2 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 23, 2026 | Completed final sign-off Jun 2026 | 310 Font Bl | re-roofing (hotworks)Details
re-roofing (hotworks) | $14,870 |
| Jun 10, 2026 | Completed final sign-off Aug 2026 | 1541 Polk St | re-roofing (w/ hotworks)Details
re-roofing (w/ hotworks) | $46,980 |
| Jun 10, 2026 | Completed final sign-off Jul 2026 | 1457 Page St | re-roofing (hot works)Details
re-roofing (hot works) | $22,490 |
| Jun 4, 2026 | Completed final sign-off Jun 2026 | 23 Acevedo Av | re-rooding. 960 sq. ft. tile lift. no hot works, remove tiles, replace underlayment, set existing tiles, replace any broken tiles with in-kind tilesDetails
re-rooding. 960 sq. ft. tile lift. no hot works, remove tiles, replace underlayment, set existing tiles, replace any broken tiles with in-kind tiles | $19,000 |
| May 26, 2026 | Completed final sign-off Jun 2026 | 4837 17th St | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $15,000 |
| May 13, 2026 | Completed final sign-off May 2026 | 522 Gonzalez Dr | reroofing no hot worksDetails
reroofing no hot works | $28,124 |
| May 4, 2026 | Completed final sign-off May 2026 | 577 Arballo Dr | units 575-577: reroof, no hot work.Details
units 575-577: reroof, no hot work. | $9,600 |
| May 4, 2026 | Completed final sign-off May 2026 | 5 Fuente Av | units 5-7: reroof, hot work.Details
units 5-7: reroof, hot work. | $21,180 |
| Apr 23, 2026 | Completed final sign-off May 2026 | 112 Crespi Dr | reroofing no hot worksDetails
reroofing no hot works | $22,880 |
| Apr 23, 2026 | Completed final sign-off May 2026 | 116 Juan Bautista Cr | reroofing torch down.Details
reroofing torch down. | $16,030 |
| Apr 15, 2026 | Completed final sign-off May 2026 | 27 Bucareli Dr | unit #27, 29, reroofing with hot works, tear off 1,226 sqft modified bitumen. no work to (e) roof structural sheathing. reroofing at flat roof only. no work to (e) sloped roofs.Details
unit #27, 29, reroofing with hot works, tear off 1,226 sqft modified bitumen. no work to (e) roof structural sheathing. reroofing at flat roof only. no work to (e) sloped roofs. | $15,986 |
| Apr 15, 2026 | Completed final sign-off Apr 2026 | 203 Serrano Dr | unit #203, 205, 207 reroofing with hot works, tear off 1,350 sqft modified bitumen. no work to (e) roof structural sheathing. reroofing at flat roof only. no work to (e) sloped roof.Details
unit #203, 205, 207 reroofing with hot works, tear off 1,350 sqft modified bitumen. no work to (e) roof structural sheathing. reroofing at flat roof only. no work to (e) sloped roof. | $17,075 |
| Apr 14, 2026 | Completed final sign-off May 2026 | 601 Arballo Dr | reroofing hot worksDetails
reroofing hot works | $29,072 |
| Apr 14, 2026 | Completed final sign-off May 2026 | 16 Juan Bautista Cr | reroofing hot worksDetails
reroofing hot works | $31,630 |
| Apr 9, 2026 | Completed final sign-off Apr 2026 | 522 Vidal Dr | reroofing with hot works, tear off, install 1,125sqft modified bitumen.Details
reroofing with hot works, tear off, install 1,125sqft modified bitumen. | $14,895 |
| Apr 9, 2026 | Completed final sign-off Apr 2026 | 430 Vidal Dr | reroofing with hot works, tear off, install 800sqft modified bitumen, 700 sqft tile lift.Details
reroofing with hot works, tear off, install 800sqft modified bitumen, 700 sqft tile lift. | $25,632 |
| Mar 31, 2026 | Completed final sign-off May 2026 | 3721 25th St | reroofing hot worksDetails
reroofing hot works | $21,950 |
| Mar 26, 2026 | Completed final sign-off Apr 2026 | 110 Juan Bautista Cr | unit 108 juan bautista: reroof, no hot work.Details
unit 108 juan bautista: reroof, no hot work. | $20,960 |
| Mar 26, 2026 | Completed final sign-off Apr 2026 | 107 Serrano Dr | reroof w/ hot work.Details
reroof w/ hot work. | $17,100 |
| Mar 24, 2026 | Completed final sign-off Apr 2026 | 335 Gonzalez Dr | re-roofing (no hotworks). in kind tileDetails
re-roofing (no hotworks). in kind tile | $25,155 |
| Mar 24, 2026 | Completed final sign-off Apr 2026 | 111 Tapia Dr | re-roofing (no hotworks) units#109,111 and 115, to comply with nov#202651379, item#2. in kind tile.Details
re-roofing (no hotworks) units#109,111 and 115, to comply with nov#202651379, item#2. in kind tile. | $19,854 |
| Mar 19, 2026 | Completed final sign-off Apr 2026 | 228 Font Bl | reroofing hot worksDetails
reroofing hot works | $9,220 |
| Mar 10, 2026 | Completed final sign-off Apr 2026 | 16 Hill St | reroofing hot worksDetails
reroofing hot works | $35,000 |
| Mar 10, 2026 | Completed final sign-off Mar 2026 | 110 Grijalva Dr | aka 104 grijalva dr: reroofing: hot works. customer would like to proceed using 110 grijalva.Details
aka 104 grijalva dr: reroofing: hot works. customer would like to proceed using 110 grijalva. | $18,680 |
| Feb 17, 2026 | Completed final sign-off Mar 2026 | 16 Fuente Av | reroofing 960 sq ft. tile lift no hot worksDetails
reroofing 960 sq ft. tile lift no hot works | $22,330 |
| Feb 17, 2026 | Completed final sign-off Mar 2026 | 122 Garces Dr | reroofing 1,240 sqft tile lift no hot worksDetails
reroofing 1,240 sqft tile lift no hot works | $17,360 |
| Feb 9, 2026 | Completed final sign-off Feb 2026 | 104 Cardenas Av | reroof w/ hot work.Details
reroof w/ hot work. | $15,640 |
| Feb 9, 2026 | Completed final sign-off Mar 2026 | 31 Rivas Av | reroofing w/hot work.Details
reroofing w/hot work. | $16,570 |
| Feb 4, 2026 | Completed final sign-off Mar 2026 | 126 Cardenas Av | re-roofing tile lift (1960 sqft) replace broken tiles ( up to 150) in-kind no hot worksDetails
re-roofing tile lift (1960 sqft) replace broken tiles ( up to 150) in-kind no hot works | $32,740 |
| Jan 13, 2026 | Completed final sign-off Feb 2026 | 2500 Polk St | reroofing with hot worksDetails
reroofing with hot works | $33,054 |
| Jan 13, 2026 | Completed final sign-off Feb 2026 | 1126 Stanyan St | reroofing no hot worksDetails
reroofing no hot works | $26,080 |
| Jan 5, 2026 | Completed final sign-off Jan 2026 | 550 Arballo Dr | reroof with torch: roof replacement, 1700 sqft.Details
reroof with torch: roof replacement, 1700 sqft. | $20,330 |
| Jan 2, 2026 | In progress filed Jan 2026, not yet issued | 38 Cambon Dr | re-roofing (w/ torch)Details
re-roofing (w/ torch) | $20,330 |
| Dec 19, 2025 | Completed final sign-off Jan 2026 | 422 Gonzalez Dr | reroofing: tear off roof, install new underlayment, torch down, new modified bitumen roof 1900 sq ft.Details
reroofing: tear off roof, install new underlayment, torch down, new modified bitumen roof 1900 sq ft. | $18,360 |
| Dec 18, 2025 | Completed final sign-off Jan 2026 | 144 Gonzalez Dr | re-roofing (no hotworks)Details
re-roofing (no hotworks) | $24,700 |
| Dec 18, 2025 | Completed final sign-off Jan 2026 | 423 Font Bl | re-roofing (no hotworks)Details
re-roofing (no hotworks) | $18,624 |
| Dec 17, 2025 | Completed final sign-off Jan 2026 | 101 Serrano Dr | re-roofing: lift 700 sq ft of tile, install new underlayment, re-set existing tiles.Details
re-roofing: lift 700 sq ft of tile, install new underlayment, re-set existing tiles. | $8,500 |
| Nov 18, 2025 | Completed final sign-off Dec 2025 | 1 Grijalva Dr | re-roofing - no torchdownDetails
re-roofing - no torchdown | $8,695 |
| Nov 17, 2025 | Completed final sign-off Dec 2025 | 15 Acevedo Av | reroof. torch down.Details
reroof. torch down. | $24,600 |
| Nov 17, 2025 | Completed final sign-off Dec 2025 | 116 Grijalva Dr | reroofing, tear off roof, install new 4ply burl with granulated cap sheet. no torch.Details
reroofing, tear off roof, install new 4ply burl with granulated cap sheet. no torch. | $12,900 |
| Nov 17, 2025 | Completed final sign-off Dec 2025 | 23 Bucareli Dr | reroofing. 10 sq tle lift, install new underlayment. comply with 202543024. no torch.Details
reroofing. 10 sq tle lift, install new underlayment. comply with 202543024. no torch. | $16,700 |
| Nov 13, 2025 | Completed final sign-off Dec 2025 | 528 Vidal Dr | reroofing: tile lift 1700 sqft, install new underlayment and reset existing tiles. no torch.Details
reroofing: tile lift 1700 sqft, install new underlayment and reset existing tiles. no torch. | $18,876 |
| Nov 13, 2025 | Completed final sign-off Dec 2025 | 116 Juan Bautista Cr | reroofing: tile lift 1700 sqft, install new underlayment and reset existing tiles. no torch.Details
reroofing: tile lift 1700 sqft, install new underlayment and reset existing tiles. no torch. | $8,940 |
| Oct 8, 2025 | Completed final sign-off Oct 2025 | 195 Shipley St | re roofing: hot works.Details
re roofing: hot works. | $9,400 |
| Oct 1, 2025 | Completed final sign-off Oct 2025 | 135 Serrano Dr | re roofing: hot works.Details
re roofing: hot works. | $6,685 |
| Sep 22, 2025 | Completed final sign-off Jan 2026 | 475 37th Av | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $14,422 |
| Sep 5, 2025 | Completed final sign-off Oct 2025 | 5 Fuente Av | reroofing: apply overlaying tar layer over (e) roof 1250 sq ft. no hot works. work to be done on 1 fuente avenue.Details
reroofing: apply overlaying tar layer over (e) roof 1250 sq ft. no hot works. work to be done on 1 fuente avenue. | $11,400 |
| Sep 5, 2025 | Completed final sign-off Sep 2025 | 404 Vidal Dr | reroof. no hot works.1050 sq sf. tear off roof and install built up roof system.Details
reroof. no hot works.1050 sq sf. tear off roof and install built up roof system. | $6,900 |
| Sep 3, 2025 | Completed final sign-off Sep 2025 | 352 Serrano Dr | re roofing: hot works.Details
re roofing: hot works. | $13,700 |
| Sep 3, 2025 | Completed final sign-off Sep 2025 | 400 Font Bl | re-roofing (no hotworks)Details
re-roofing (no hotworks) | $7,500 |
| Sep 3, 2025 | Completed final sign-off Sep 2025 | 406 Font Bl | re-roofing (no hotworks)Details
re-roofing (no hotworks) | $11,935 |
| Sep 3, 2025 | Completed final sign-off Sep 2025 | 102 Tapia Dr | re roofing: hot worksDetails
re roofing: hot works | $8,175 |
| Aug 14, 2025 | Completed final sign-off Sep 2025 | 111 Tapia Dr | reroofing. no hot works.Details
reroofing. no hot works. | $4,700 |
| Aug 14, 2025 | Completed final sign-off Sep 2025 | 129 Bucareli Dr | remove existing roof membrane and install new modified bitumen (600 sqft); hot works; sri 75 minDetails
remove existing roof membrane and install new modified bitumen (600 sqft); hot works; sri 75 min | $7,200 |
| Aug 11, 2025 | Completed final sign-off Sep 2025 | 214 Gonzalez Dr | reroofing: tear off and installation of new roof material/ 750 sq ft modified bitumen (hot works) rooftop on top of 218 gonzalez dr.Details
reroofing: tear off and installation of new roof material/ 750 sq ft modified bitumen (hot works) rooftop on top of 218 gonzalez dr. | $7,700 |
| Aug 11, 2025 | Completed final sign-off Sep 2025 | 1049 Valencia St | reroofing: 2100 sq ft modified bitumen (hot works) 1300 sq ft asphalt shingles. tear off roof, new installation of roof material.Details
reroofing: 2100 sq ft modified bitumen (hot works) 1300 sq ft asphalt shingles. tear off roof, new installation of roof material. | $42,000 |
| Aug 4, 2025 | Completed final sign-off Aug 2025 | 137 Serrano Dr | reroofing with hot works.Details
reroofing with hot works. | $8,300 |
| Jul 30, 2025 | Completed final sign-off Aug 2025 | 19 Diaz Av | re-roof 560 sq ft of flat roof. install new modified bitumen cap sheet. hot works.Details
re-roof 560 sq ft of flat roof. install new modified bitumen cap sheet. hot works. | $7,000 |
| Jul 30, 2025 | Completed final sign-off Aug 2025 | 345 Arballo Dr | re-roofing: tile lift, lift tiles, install new underlayment, re-set tiles in kind. no hot works. approx 700 sq ft.Details
re-roofing: tile lift, lift tiles, install new underlayment, re-set tiles in kind. no hot works. approx 700 sq ft. | $21,310 |
| Jul 10, 2025 | Completed final sign-off Oct 2025 | 1325 Valencia St | re-roofingDetails
re-roofing | $337,530 |
| Jun 25, 2025 | Completed final sign-off Jul 2025 | 1782 35th Av | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $2,000 |
| Jun 13, 2025 | Completed final sign-off Jun 2025 | 455 Flood Av | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $14,000 |
| Jun 13, 2025 | In progress issued Jun 2025 | 2550 Sloat Bl | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $40,000 |
| Apr 28, 2025 | Completed final sign-off Jun 2025 | 723 Andover St | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $20,000 |
| Mar 19, 2025 | Completed final sign-off Apr 2025 | 1757 Waller St | re-roofing with hot worksDetails
re-roofing with hot works | $9,900 |
| Feb 14, 2025 | Completed final sign-off Mar 2025 | 33 Aladdin Tr | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $12,000 |
| Jan 10, 2025 | Completed final sign-off Feb 2025 | 6 Jennifer Pl | re-roofing with torch down. no work to (e) roof structural sheathing.Details
re-roofing with torch down. no work to (e) roof structural sheathing. | $7,560 |
| Nov 15, 2024 | Completed final sign-off Mar 2025 | 40 Belden St | reroofing torch down, about 43 sq. ft.Details
reroofing torch down, about 43 sq. ft. | $48,230 |
| Oct 31, 2024 | Completed final sign-off Nov 2024 | 40 Iris Av | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $18,375 |
| Oct 2, 2024 | Completed final sign-off Feb 2025 | 214 Galewood Cr | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $21,000 |
| Sep 10, 2024 | Completed final sign-off Sep 2024 | 4319 Cesar Chavez St | reroofingDetails
reroofing | $24,000 |
| Aug 22, 2024 | Completed final sign-off Oct 2024 | 2622 34th Av | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $13,400 |
| Aug 13, 2024 | Completed final sign-off Sep 2024 | 290 Lombard St | reroofing.Details
reroofing. | $37,400 |
| Aug 6, 2024 | Completed final sign-off Aug 2024 | 589 Myra Wy | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $7,400 |
| Jul 24, 2024 | Completed final sign-off Oct 2024 | 183 Galewood Cr | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $21,300 |
| Jul 24, 2024 | Completed final sign-off Aug 2024 | 40 San Felipe Av | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $15,000 |
| Jul 15, 2024 | Completed final sign-off Sep 2024 | 1465 Washington St | reroofing. demo existing roof membrane, apply underlayment and modified bitumen. install new primed shiplap siding to replace damaged siding in lightwell/court. approx. 80 sq ft.Details
reroofing. demo existing roof membrane, apply underlayment and modified bitumen. install new primed shiplap siding to replace damaged siding in lightwell/court. approx. 80 sq ft. | $41,160 |
| Jun 17, 2024 | Completed final sign-off Jun 2024 | 1670 Hayes St | reroofingDetails
reroofing | $22,240 |
| Jun 14, 2024 | Expired or cancelled cancelled Jul 2024 | 2908 25th St | re-roofingDetails
re-roofing | $11,200 |
| May 9, 2024 | Completed final sign-off Jun 2024 | 1479 Washington St | reroofingDetails
reroofing | $22,900 |
| Dec 19, 2023 | Completed final sign-off May 2024 | 110 Broderick St | re-roofingDetails
re-roofing | $16,000 |
| Dec 19, 2023 | Completed final sign-off Mar 2025 | 753 Webster St | reroofingDetails
reroofing | $11,000 |
| Nov 29, 2023 | Completed final sign-off Mar 2025 | 1530 Fell St | reroofingDetails
reroofing | $11,300 |
| Nov 6, 2023 | Expired or cancelled cancelled Nov 2023 | 1330 Fell St | re-roofingDetails
re-roofing | $11,300 |
| Nov 6, 2023 | Completed final sign-off Mar 2025 | 1631 Hayes St | re-roofingDetails
re-roofing | $26,600 |
| Oct 23, 2023 | Completed final sign-off Dec 2023 | 208 London St | reroofing. install new polyfresko & modified bitumen torch down for 1,200 sq. ft. & install new westlake royal stone coated metal roofDetails
reroofing. install new polyfresko & modified bitumen torch down for 1,200 sq. ft. & install new westlake royal stone coated metal roof | $25,000 |