Back to kitchen remodel contractors
Atlantic Construction Co Inc
- Based in
- San Francisco
- On San Francisco permits
- Aug 2001 to Jul 2025
- Last 24 months
- 3 permits filed
42 permits since 2000: 36 completed, 4 never finaled, 2 expired or cancelled.
Of the 4 never-finaled permits, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
13 kitchen remodel permits: 13 completed. Typically 17 days from filing to permit and 261 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 25, 2025 | Completed final sign-off Apr 2026 | 426 Hugo St | remodel kitchen on #428 floor level 3. remodel hallway bath and half bath on #428 floor level. remove (e) fireplace in dining room on #428 floor level. install new electrical control and lighting thru out #428 floor level.Details
remodel kitchen on #428 floor level 3. remodel hallway bath and half bath on #428 floor level. remove (e) fireplace in dining room on #428 floor level. install new electrical control and lighting thru out #428 floor level. | $45,000 |
| Jan 18, 2022 | Completed final sign-off Mar 2022 | 736 29th Av | replace kitchen cabinet and countertop.Details
replace kitchen cabinet and countertop. | $5,000 |
| Feb 2, 2021 | Completed final sign-off Apr 2022 | 426 Hugo St | remodel kitchen in uint 426. remove esisting staircase & infill opening. remodel 2 bathrooms. replace all windows in unit 426, except window facing street. install electric and lighting. install new drywall & insullation. re-configurate existing bedroom #4 into new dining rm & dining into bedrmDetails
remodel kitchen in uint 426. remove esisting staircase & infill opening. remodel 2 bathrooms. replace all windows in unit 426, except window facing street. install electric and lighting. install new drywall & insullation. re-configurate existing bedroom #4 into new dining rm & dining into bedrm | $150,000 |
| Sep 8, 2020 | Completed final sign-off Oct 2020 | 1401 Sloat Bl | revision to pa# 202001222475: kitchen on the ground fl, removing 1 non-structural wall. master bathroom on the 2nd fl removing 1 non-structural wall.Details
revision to pa# 202001222475: kitchen on the ground fl, removing 1 non-structural wall. master bathroom on the 2nd fl removing 1 non-structural wall. | $6,000 |
| Jan 22, 2020 | Completed final sign-off Oct 2020 | 1401 Sloat Bl | bathroom and kitchen remodel on 2nd floor. everything in the same locationDetails
bathroom and kitchen remodel on 2nd floor. everything in the same location | $1,500 |
| Sep 27, 2019 | Completed final sign-off Nov 2020 | 1411 39th Av | reconfigure bedroom 1 closet into (n) master bathrm and bedrm closet; (e) hall bathrm to new 1/2 bath; remove (e) 2x4 skylight and add 1 skylight; (e) kitchen and breakfast nook into (n) kitchen; gr fl - add bedroom #2 and #3, bath and family rm & storage; new lighting & controls throughout;Details
reconfigure bedroom 1 closet into (n) master bathrm and bedrm closet; (e) hall bathrm to new 1/2 bath; remove (e) 2x4 skylight and add 1 skylight; (e) kitchen and breakfast nook into (n) kitchen; gr fl - add bedroom #2 and #3, bath and family rm & storage; new lighting & controls throughout; | $90,000 |
| Jul 29, 2019 | Completed final sign-off Nov 2019 | 3417 Irving St | remodel 1 kitchen and 1 bathroom. electrical panel 100 amp service.Details
remodel 1 kitchen and 1 bathroom. electrical panel 100 amp service. | $20,000 |
| Nov 23, 2016 | Completed final sign-off Jan 2018 | 1223 York St | remodel and relocate kitchen, add 2nd bathroom. remodel (e) bathroom, convert living toom to bedroom, convert dining room to den, convert kitchen and foyer to living roomDetails
remodel and relocate kitchen, add 2nd bathroom. remodel (e) bathroom, convert living toom to bedroom, convert dining room to den, convert kitchen and foyer to living room | $40,000 |
| Nov 23, 2016 | Completed final sign-off Jan 2018 | 1223 York St | remodel and relocate kitchen, add 2nd bathroom. remodel (e) bathroom, convert living toom to bedroom, convert dining room to den, convert kitchen to dining roomDetails
remodel and relocate kitchen, add 2nd bathroom. remodel (e) bathroom, convert living toom to bedroom, convert dining room to den, convert kitchen to dining room | $40,000 |
| Jan 19, 2016 | Completed final sign-off Mar 2016 | 187 Tucker Av | kitchen remodeling, same location, sink & dishwasher, upgrade electrical.Details
kitchen remodeling, same location, sink & dishwasher, upgrade electrical. | $12,000 |
| Sep 30, 2015 | Completed final sign-off Jun 2017 | 37 Maynard St | revision to pa#201505196642: relocate 1/2 bath & delete bedroom at g/f, remove 3'6" wall at 2nd level between dining & kitchen and add a new beam at the location and post to ground level, relocate bathroom fixture at 3/f bathroom.Details
revision to pa#201505196642: relocate 1/2 bath & delete bedroom at g/f, remove 3'6" wall at 2nd level between dining & kitchen and add a new beam at the location and post to ground level, relocate bathroom fixture at 3/f bathroom. | $2,500 |
| May 19, 2015 | Completed final sign-off Jun 2017 | 37 Maynard St | remodel (e) bathroom & add one new bathroom at 3rd floor. remodle (e) kitchen, bathroom at 2nd floor. remodel (e) multipurpose room, add half bathroom & bedroom at ground floor.Details
remodel (e) bathroom & add one new bathroom at 3rd floor. remodle (e) kitchen, bathroom at 2nd floor. remodel (e) multipurpose room, add half bathroom & bedroom at ground floor. | $48,000 |
| Dec 23, 2008 | Completed final sign-off Jun 2009 | 2581 22nd Av | revision to 200811146553, additional work to recent kitchen and bath remodel: upgrades to kitchen,new compliant stairs and bath, change rear and side windows. remodel mstr suite and (e) bedrooms, voluntary plywood strengthening at main floorDetails
revision to 200811146553, additional work to recent kitchen and bath remodel: upgrades to kitchen,new compliant stairs and bath, change rear and side windows. remodel mstr suite and (e) bedrooms, voluntary plywood strengthening at main floor | $25,000 |