Associated Trucking Inc
- Based in
- San Bruno
- On San Francisco permits
- Dec 2006 to Feb 2025
- Last 24 months
- 1 permit filed
73 permits since 2000: 54 completed, 11 never finaled, 8 expired or cancelled.
Of the 11 never-finaled permits, 2 are 5 to 10 years old, 9 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Deck permits
6 deck permits: 6 completed. Typically 80 days from filing to permit and 376 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 24, 2015 | Completed final sign-off May 2016 | 484 Day St | new foundation & lower slab in basement, new living space in basement behind (e) garage, basement infill @ rear lightwell beneath (e) living space - new stair, 1 full bath, 1 half bath, family room, laundry, new rear deck. curb cut and mseDetails
new foundation & lower slab in basement, new living space in basement behind (e) garage, basement infill @ rear lightwell beneath (e) living space - new stair, 1 full bath, 1 half bath, family room, laundry, new rear deck. curb cut and mse | $140,000 |
| Mar 19, 2015 | Completed final sign-off Dec 2016 | 1764 Dolores St | 362 sf horizontal addition to 1st fl @ rear, 86 sf horizontal addition to 2nd fl @ rear, interior remodel of kitchen & miscellaneous improvements to finishes throughout the house, create useable deck on top of 2nd fl addition.Details
362 sf horizontal addition to 1st fl @ rear, 86 sf horizontal addition to 2nd fl @ rear, interior remodel of kitchen & miscellaneous improvements to finishes throughout the house, create useable deck on top of 2nd fl addition. | $189,000 |
| Sep 10, 2013 | Completed final sign-off Jul 2014 | 17 Costa St | remove extg retaining wall and extg deck. install new retaining wall and new concrete slab deck.Details
remove extg retaining wall and extg deck. install new retaining wall and new concrete slab deck. | $20,000 |
| Apr 12, 2013 | Completed final sign-off May 2015 | 4207 26th St | back yard renovation:create lower patio space by retaining walls. install pavers and deck on extg upper yard. new fences.Details
back yard renovation:create lower patio space by retaining walls. install pavers and deck on extg upper yard. new fences. | $75,000 |
| Oct 24, 2012 | Completed final sign-off Dec 2012 | 1948 Pacific Av | remove deteriorated rear decks not visible from street.Details
remove deteriorated rear decks not visible from street. | $6,000 |
| Apr 29, 2011 | Completed final sign-off Apr 2013 | 143 Collingwood St | interior renovation, removal or bowed bay window and install french doors, add architectural balcony creating bedroom and bath at lower level with interior stair. replacing facade stucco in kind. establishing exercise rm, family, study, full bath and rear deck at gr fl.Details
interior renovation, removal or bowed bay window and install french doors, add architectural balcony creating bedroom and bath at lower level with interior stair. replacing facade stucco in kind. establishing exercise rm, family, study, full bath and rear deck at gr fl. | $85,000 |