Back to bathroom remodel contractors
Associated Trucking Inc
- Based in
- San Bruno
- On San Francisco permits
- Dec 2006 to Feb 2025
- Last 24 months
- 1 permit filed
73 permits since 2000: 54 completed, 11 never finaled, 8 expired or cancelled.
Of the 11 never-finaled permits, 2 are 5 to 10 years old, 9 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
23 bathroom remodel permits: 21 completed, 2 never finaled. Typically 0 days from filing to permit and 357 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 25, 2020 | Completed final sign-off Jan 2023 | 260 Claremont Bl | lower level excavation - new 2 bath, 2 bedroom family room, laundry room; main floor - bath/closet, kitchen remodel; new staircase through all floorsDetails
lower level excavation - new 2 bath, 2 bedroom family room, laundry room; main floor - bath/closet, kitchen remodel; new staircase through all floors | $400,000 |
| Apr 1, 2019 | Completed final sign-off Feb 2021 | 725 44th Av | horizontal extension. foundation replacement, interior remodel, adding 1 bedroom 1-1/2 bath, relocate kitchen & dining, rear yard regrading.Details
horizontal extension. foundation replacement, interior remodel, adding 1 bedroom 1-1/2 bath, relocate kitchen & dining, rear yard regrading. | $300,000 |
| Jun 24, 2015 | Completed final sign-off May 2016 | 484 Day St | new foundation & lower slab in basement, new living space in basement behind (e) garage, basement infill @ rear lightwell beneath (e) living space - new stair, 1 full bath, 1 half bath, family room, laundry, new rear deck. curb cut and mseDetails
new foundation & lower slab in basement, new living space in basement behind (e) garage, basement infill @ rear lightwell beneath (e) living space - new stair, 1 full bath, 1 half bath, family room, laundry, new rear deck. curb cut and mse | $140,000 |
| Nov 26, 2014 | Never finaled issued Aug 2015, no final | 46 Manchester St | rear bldg: replace extg foundation and add new basement level with bathroom and laundry. remodel extg 1st floor with new kitchen and staircase and remodel 2nd floor including new bathroom. replace extg painted wood siding with new painted siding.Details
rear bldg: replace extg foundation and add new basement level with bathroom and laundry. remodel extg 1st floor with new kitchen and staircase and remodel 2nd floor including new bathroom. replace extg painted wood siding with new painted siding. | $108,000 |
| Apr 9, 2014 | Never finaled issued Mar 2015, no final | 153 Clipper St | convert (e) underfloor basement into living space, parking garage & bathroom.Details
convert (e) underfloor basement into living space, parking garage & bathroom. | $75,000 |
| Nov 27, 2013 | Completed final sign-off Jan 2015 | 2759 Broderick St | excavate at garage level crawl space to add new laundry, water closet, 3 storp elevator, replace sitting rm windows with french doors, rework enlarge openings in dinng room walls, demolish master bedroom fireplace and add new window, remodel existing baths and laundry rm. remodel kitchenDetails
excavate at garage level crawl space to add new laundry, water closet, 3 storp elevator, replace sitting rm windows with french doors, rework enlarge openings in dinng room walls, demolish master bedroom fireplace and add new window, remodel existing baths and laundry rm. remodel kitchen | $325,000 |
| Nov 1, 2013 | Completed final sign-off Jun 2018 | 3332 Folsom St | expand rear bedroom & kitchen into rear yard. new roof deck over expanded kitchen. raise building 42" to accommodate required parking. infill @ existing side yard front of building. replace entry stair. new master bedroom, bathroom and closet.Details
expand rear bedroom & kitchen into rear yard. new roof deck over expanded kitchen. raise building 42" to accommodate required parking. infill @ existing side yard front of building. replace entry stair. new master bedroom, bathroom and closet. | $85,000 |
| Apr 11, 2012 | Completed final sign-off Oct 2012 | 1856 Franklin St | unit 8: remodel kitchen and bath in kind. lighting change to comply with t24Details
unit 8: remodel kitchen and bath in kind. lighting change to comply with t24 | $35,000 |
| Jan 20, 2012 | Completed final sign-off Aug 2012 | 251 Hartford St | minor interior remodel - no change to bldg envelope, renovate kitchen & bath, (n) skylights, voluntary plywood stiffening in ground floor unit modified. retaining wall in backyard.Details
minor interior remodel - no change to bldg envelope, renovate kitchen & bath, (n) skylights, voluntary plywood stiffening in ground floor unit modified. retaining wall in backyard. | $150,000 |
| Jun 15, 2011 | Completed final sign-off Jun 2012 | 2 Ashbury Tr | interior remodel of existing single family dwelling. install new wood clad windows, restucco exterior. new basement storage and mech rooms with new retaining walls. foundation repaired or replaced as required. new skylights, 3 new baths, (1 at basement)Details
interior remodel of existing single family dwelling. install new wood clad windows, restucco exterior. new basement storage and mech rooms with new retaining walls. foundation repaired or replaced as required. new skylights, 3 new baths, (1 at basement) | $450,000 |
| Apr 29, 2011 | Completed final sign-off Apr 2013 | 143 Collingwood St | interior renovation, removal or bowed bay window and install french doors, add architectural balcony creating bedroom and bath at lower level with interior stair. replacing facade stucco in kind. establishing exercise rm, family, study, full bath and rear deck at gr fl.Details
interior renovation, removal or bowed bay window and install french doors, add architectural balcony creating bedroom and bath at lower level with interior stair. replacing facade stucco in kind. establishing exercise rm, family, study, full bath and rear deck at gr fl. | $85,000 |
| Sep 22, 2009 | Completed final sign-off Aug 2010 | 2057 15th St | unit #2057a: remodel kitchen, 2 bathrooms in kind, no structural work. provide h.e. lights per title 24 mandartory measuresDetails
unit #2057a: remodel kitchen, 2 bathrooms in kind, no structural work. provide h.e. lights per title 24 mandartory measures | $23,000 |
| Sep 3, 2009 | Completed final sign-off Aug 2010 | 2057 15th St | work @ unit#2057c. remodel kitchen adn bathroom in kind. no wall removal. kitchen: replace cabinets & counters. bath : replace fixtures & tile new lighting.Details
work @ unit#2057c. remodel kitchen adn bathroom in kind. no wall removal. kitchen: replace cabinets & counters. bath : replace fixtures & tile new lighting. | $15,000 |
| Sep 3, 2009 | Completed final sign-off Aug 2010 | 2079 15th St | work @ unit#2057e. remodel kitchen and two bathroom in kind. no wall removal. kitchen: replace cabinets & counters. bath : replace fixtures & tile new lighting.Details
work @ unit#2057e. remodel kitchen and two bathroom in kind. no wall removal. kitchen: replace cabinets & counters. bath : replace fixtures & tile new lighting. | $25,000 |
| Sep 3, 2009 | Completed final sign-off Aug 2010 | 2057 15th St | work @ unit#2057d. remodel kitchen adn bathroom in kind. no wall removal. kitchen: replace cabinets & counters. bath : replace fixtures & tile new lighting.Details
work @ unit#2057d. remodel kitchen adn bathroom in kind. no wall removal. kitchen: replace cabinets & counters. bath : replace fixtures & tile new lighting. | $15,000 |
| Sep 3, 2009 | Completed final sign-off Aug 2010 | 2057 15th St | work @ unit#2057f. remodel kitchen adn bathroom in kind. no wall removal. kitchen: replace cabinets & counters. bath : replace fixtures & tile new lighting.Details
work @ unit#2057f. remodel kitchen adn bathroom in kind. no wall removal. kitchen: replace cabinets & counters. bath : replace fixtures & tile new lighting. | $25,000 |
| Aug 31, 2009 | Completed final sign-off Aug 2010 | 2057 15th St | work @ #2057b 15th street. remodel kitchen and two baths. in kind. no removal of walls. kitchen: replace cabinets & counters. bath: replace plumbing fixtures retile walls & floor. no structural work and relocation of walls. replace lighting.Details
work @ #2057b 15th street. remodel kitchen and two baths. in kind. no removal of walls. kitchen: replace cabinets & counters. bath: replace plumbing fixtures retile walls & floor. no structural work and relocation of walls. replace lighting. | $23,000 |
| May 1, 2009 | Completed final sign-off Aug 2010 | 2057 15th St | work @ unit# 2079f only. remodel kitchen & 2 baths in kind. replace cabinets, counters, undermount sinks in kitchen & replace tile & fixtures in baths.Details
work @ unit# 2079f only. remodel kitchen & 2 baths in kind. replace cabinets, counters, undermount sinks in kitchen & replace tile & fixtures in baths. | $23,000 |
| May 1, 2009 | Completed final sign-off Jan 2010 | 2057 15th St | work @ unit# 2079b only. remodel kitchen & 2 baths in kind. replace cabinets, counters, undermount sinks & fixtures. replace tile & fixtures in baths.Details
work @ unit# 2079b only. remodel kitchen & 2 baths in kind. replace cabinets, counters, undermount sinks & fixtures. replace tile & fixtures in baths. | $23,000 |
| May 1, 2009 | Completed final sign-off Jan 2010 | 2079 15th St | work @ unit# 2079d only. remodel kitchen & baths in kind. replace cabinets, counters, undermount sinks in kitchen & replace tile & fixtures in baths.Details
work @ unit# 2079d only. remodel kitchen & baths in kind. replace cabinets, counters, undermount sinks in kitchen & replace tile & fixtures in baths. | $18,000 |
| Mar 18, 2009 | Completed final sign-off Jan 2010 | 2057 15th St | work @ unit# 2079a. remodel kitchen & bath in kind. provide 1/2 of kitchen light watts of fluorescent. provide fluorescent lights or occupancy sensor in bathroom.Details
work @ unit# 2079a. remodel kitchen & bath in kind. provide 1/2 of kitchen light watts of fluorescent. provide fluorescent lights or occupancy sensor in bathroom. | $27,500 |
| Mar 18, 2009 | Completed final sign-off Sep 2010 | 2057 15th St | work @ unit# 2079e. remodel kitchen & bath in kind. provide 1/2 of kitchen light watts of fluorescent. provide fluorescent lights or occupancy sensor in bathroom.Details
work @ unit# 2079e. remodel kitchen & bath in kind. provide 1/2 of kitchen light watts of fluorescent. provide fluorescent lights or occupancy sensor in bathroom. | $27,500 |
| Mar 18, 2009 | Completed final sign-off Jan 2010 | 2057 15th St | work @ unit# 2079c. remodel kitchen & bath in kind. provide 1/2 of kitchen light watts of fluorescent. provide fluorescent lights or occupancy sensor in bathroom.Details
work @ unit# 2079c. remodel kitchen & bath in kind. provide 1/2 of kitchen light watts of fluorescent. provide fluorescent lights or occupancy sensor in bathroom. | $27,500 |