Back to kitchen remodel contractors
Aspen Contractors Inc
- Based in
- San Francisco
- On San Francisco permits
- Dec 2000 to Apr 2026
- Last 24 months
- 2 permits filed
19 permits since 2000: 17 completed, 2 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
1 kitchen remodel permit: 1 completed. Typically 2 days from filing to permit and 57 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 15, 2022 | Completed final sign-off Oct 2022 | 2 Falmouth St | unit #2: remodel 2/f replace with like size 7 wall & 5 base kitchen cabinets and counter, replace 150 sqft water damaged drywall, replace 400 sqft laminate flooring and paint entire unit + hallway, repair windows.Details
unit #2: remodel 2/f replace with like size 7 wall & 5 base kitchen cabinets and counter, replace 150 sqft water damaged drywall, replace 400 sqft laminate flooring and paint entire unit + hallway, repair windows. | $60,000 |