Back to kitchen remodel contractors
Artco Remoldeling & Construction
- Based in
- San Francisco
- On San Francisco permits
- Mar 2000 to Dec 2003
- Last 24 months
- 0 permits filed
56 permits since 2000: 45 completed, 1 never finaled, 10 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
6 kitchen remodel permits: 6 completed. Typically 0 days from filing to permit and 95 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 18, 2003 | Completed final sign-off Feb 2004 | 785 02nd Av | install (n) 3'x4" skylight in kitchen, locate in roof between (e) raftersDetails
install (n) 3'x4" skylight in kitchen, locate in roof between (e) rafters | $950 |
| Nov 20, 2003 | Completed final sign-off Feb 2004 | 785 02nd Av | remodel bathroom-toilet,tile,sink&floor tile.remodel kitchen-cabinets,sink,ctr top.paint&repair fl.Details
remodel bathroom-toilet,tile,sink&floor tile.remodel kitchen-cabinets,sink,ctr top.paint&repair fl. | $14,500 |
| Sep 4, 2003 | Completed final sign-off Dec 2003 | 783 02nd Av | replace kitchen cabinets as needed. repair floors & walls as needed. paint after completed. bathroomDetails
replace kitchen cabinets as needed. repair floors & walls as needed. paint after completed. bathroom | $18,000 |
| Jun 23, 2003 | Completed final sign-off Feb 2004 | 216 Anzavista Av | kitchen remodel replacement stairs relocate skylight 1 new skylight addition- garage to upper levelDetails
kitchen remodel replacement stairs relocate skylight 1 new skylight addition- garage to upper level | $92,000 |
| Aug 2, 2002 | Completed final sign-off Jan 2003 | 2017 Lincoln Wy | repl kitchen cabinets- 2 lightwell window in kindDetails
repl kitchen cabinets- 2 lightwell window in kind | $12,000 |
| Jun 18, 2001 | Completed final sign-off Aug 2001 | 449 11th Av | replace kitchen & bathroom cabinets,counter top,replace elecrical & plumbing fixts.repair for flr &Details
replace kitchen & bathroom cabinets,counter top,replace elecrical & plumbing fixts.repair for flr & | $14,500 |