Arnesen Home & Design
- Based in
- Daly City
- On San Francisco permits
- Jun 2002 to Jul 2024
- Last 24 months
- 0 permits filed
19 permits since 2000: 16 completed, 1 never finaled, 2 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
5 stairs permits: 5 completed. Typically 0 days from filing to permit and 16 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 11, 2019 | Completed final sign-off Mar 2019 | 2000 Taraval St | inkind repair of stucco window awning; stair repair at interiorDetails
inkind repair of stucco window awning; stair repair at interior | $5,000 |
| Dec 22, 2015 | Completed final sign-off Dec 2015 | 1224 07th Av | repair work to exterior stair well servicing back doors(porches) to apartment units #2, 4 & 6. (less than 50% of stairs) ; not visible from street. repair in kind.Details
repair work to exterior stair well servicing back doors(porches) to apartment units #2, 4 & 6. (less than 50% of stairs) ; not visible from street. repair in kind. | $7,500 |
| Apr 14, 2015 | Completed final sign-off Apr 2015 | 411 17th Av | remove dry rot at back landing and stairs in backyard. repair only. total repair not to exceed 50% of stair structure. call district inspector prior to start of work.Details
remove dry rot at back landing and stairs in backyard. repair only. total repair not to exceed 50% of stair structure. call district inspector prior to start of work. | $2,000 |
| Jan 22, 2015 | Completed final sign-off Jun 2015 | 129 Shakespeare St | remove and repair dry rot at front steps. repair only. total repair not to exceed 50% of stair structure.Details
remove and repair dry rot at front steps. repair only. total repair not to exceed 50% of stair structure. | $2,000 |
| Jul 7, 2005 | Completed final sign-off May 2006 | 2626 Anza St | replace in kind exterior rear stairs (dry rot damage) more than 50%.Details
replace in kind exterior rear stairs (dry rot damage) more than 50%. | $3,000 |