Arkspace Design Build Llc
- Based in
- Menlo Park
- On San Francisco permits
- Jan 2025 to Sep 2026
- Last 24 months
- 19 permits filed
19 permits since 2000: 11 completed, 6 in progress, 2 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
1 stairs permit: 1 completed. Typically 12 days from filing to permit and 379 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 26, 2025 | Completed final sign-off Jul 2026 | 1887 30th Av | revision to 202501228802. remove structural walls between kitchen and living room, reframe the stairs, adjust structural posts. replace 4 windows with same opening in the front.Details
revision to 202501228802. remove structural walls between kitchen and living room, reframe the stairs, adjust structural posts. replace 4 windows with same opening in the front. | $10,000 |