Back to kitchen remodel contractors
Ark Design Build
- Based in
- Castro Valley
- On San Francisco permits
- Feb 2022 to Jan 2025
- Last 24 months
- 1 permit filed
4 permits since 2000: 2 completed, 2 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
1 kitchen remodel permit: 1 in progress. Typically 232 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 27, 2024 | In progress issued Oct 2024 | 1410 Post St | interior remodel and alteration, remove pocket door at 1st fl. remove wall at 1st fl hall way and kitchen, remodel (e) kitchen add bathroom at 2nd fl. no change to facade, remove 5' length concrete wall at front contruct new concrete stair with 3' metal gateDetails
interior remodel and alteration, remove pocket door at 1st fl. remove wall at 1st fl hall way and kitchen, remodel (e) kitchen add bathroom at 2nd fl. no change to facade, remove 5' length concrete wall at front contruct new concrete stair with 3' metal gate | $68,000 |