Back to kitchen remodel contractors
Arco Murray Design Build
- Based in
- San Mateo
- On San Francisco permits
- Aug 2015 to May 2019
- Last 24 months
- 0 permits filed
9 permits since 2000: 7 completed, 2 never finaled.
Of the 2 never-finaled permits, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
1 kitchen remodel permit: 1 completed. Typically 89 days from filing to permit and 191 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 21, 2015 | Completed final sign-off May 2016 | 690 Folsom St | indoor table tennis club build out of an (e) shell. indoor and outdoor court with viewing areas, dining areas, bar, kitchen, food/beverage stroage & bathrooms, including but not limited to built in furniture and interior walls and finishes.Details
indoor table tennis club build out of an (e) shell. indoor and outdoor court with viewing areas, dining areas, bar, kitchen, food/beverage stroage & bathrooms, including but not limited to built in furniture and interior walls and finishes. | $1,200,000 |