Architectural Coatings
- Based in
- Mill Valley
- On San Francisco permits
- Mar 2003 to Feb 2009
- Last 24 months
- 0 permits filed
14 permits since 2000: 8 completed, 4 never finaled, 2 expired or cancelled.
Of the 4 never-finaled permits, 4 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for roof deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Roof deck permits
2 roof deck permits: 1 completed, 1 never finaled. Typically 0 days from filing to permit and 50 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 5, 2007 | Completed final sign-off Oct 2007 | 95 Duboce Av | remove existing wood & tar roof deck and install new universal protective coatings rubber deck coating system cs 401. replace defective wood as necessary.Details
remove existing wood & tar roof deck and install new universal protective coatings rubber deck coating system cs 401. replace defective wood as necessary. | $21,000 |
| Mar 21, 2003 | Never finaled filed Mar 2003, never issued | 230 Hermann St | remove builtup roof.install new proposed roof deck. remove window&install single double pane frenchDetails
remove builtup roof.install new proposed roof deck. remove window&install single double pane french |