Back to bathroom remodel contractors
Archeon Construction
- Based in
- Brentwood
- On San Francisco permits
- May 2010 to Jan 2024
- Last 24 months
- 0 permits filed
80 permits since 2000: 45 completed, 14 never finaled, 21 expired or cancelled.
Of the 14 never-finaled permits, 1 is 3 to 5 years old, 8 are 5 to 10 years old, 5 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
22 bathroom remodel permits: 13 completed, 4 never finaled, 5 expired or cancelled. Typically 1 days from filing to permit and 155 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 23, 2024 | Completed final sign-off Mar 2024 | 1428 Hyde St | change cabinets and fixtures in 2 bathroom and 1 kitchen; no moving walls.Details
change cabinets and fixtures in 2 bathroom and 1 kitchen; no moving walls. | $10,000 |
| Mar 22, 2021 | Completed final sign-off Feb 2022 | 543 Elizabeth St | (2) bathrooms - retile floor, wall, (n) shower, drywall, paint. (n) floor in kitchen, laundry room. flooring only in kitchen & laundry. no walls moved.Details
(2) bathrooms - retile floor, wall, (n) shower, drywall, paint. (n) floor in kitchen, laundry room. flooring only in kitchen & laundry. no walls moved. | $9,450 |
| Oct 30, 2018 | Expired or cancelled expired Apr 2026 | 607 Fell St | alteration to existing basement to include (n) foundation, partial height concrete walls, shear walls, & interior walls. creating two (2) new bedrooms, a new bathroom, laundry and storage room with required electrical and plumbing.Details
alteration to existing basement to include (n) foundation, partial height concrete walls, shear walls, & interior walls. creating two (2) new bedrooms, a new bathroom, laundry and storage room with required electrical and plumbing. | $150,000 |
| Oct 10, 2018 | Completed final sign-off Aug 2019 | 115 Masonic Av | ground fl habitable space remodel add 1 bathroom and storage. modify exterior opening. convert existing family room to bedroomDetails
ground fl habitable space remodel add 1 bathroom and storage. modify exterior opening. convert existing family room to bedroom | $25,000 |
| Sep 4, 2018 | Completed final sign-off Jan 2020 | 2607 Post St | rear portion of (e) building to be repaired with (n) siding. remodeled interior for (e) kitchen, (n) relocated bathroom, (n) doors at rear. removal of (e) bedroom.Details
rear portion of (e) building to be repaired with (n) siding. remodeled interior for (e) kitchen, (n) relocated bathroom, (n) doors at rear. removal of (e) bedroom. | $5,000 |
| Jan 25, 2018 | Never finaled issued Jan 2018, no final | 949 Broderick St | bathroom remodel on second floor; change shower, toilet, vanity, fixtures, drywall, paint, tiles. no change of wall at second floorDetails
bathroom remodel on second floor; change shower, toilet, vanity, fixtures, drywall, paint, tiles. no change of wall at second floor | $15,750 |
| Nov 9, 2017 | Never finaled issued Nov 2017, no final | 4537 25th St | two bathrooms remodel. replace plumbing and electrical fixtures, new tiles, paint. no framing or changing of wallsDetails
two bathrooms remodel. replace plumbing and electrical fixtures, new tiles, paint. no framing or changing of walls | $15,475 |
| May 12, 2017 | Never finaled issued May 2017, no final | 1150 Illinois St | ground fl: t.i. new ada bathroom and vent (e) furnace.Details
ground fl: t.i. new ada bathroom and vent (e) furnace. | $7,750 |
| May 9, 2017 | Expired or cancelled expired Dec 2023 | 2426 16th Av | legalizing (e) bathroom at ground floor per field inspector's request, related to bpa#2017-0426-4900.Details
legalizing (e) bathroom at ground floor per field inspector's request, related to bpa#2017-0426-4900. | $10,000 |
| Apr 26, 2017 | Expired or cancelled expired Dec 2023 | 2426 16th Av | bathroom remodel on ground floor & 2nd floor. replace (e) fixtures in kind (toilet, sink, shower). dry rot repair under previously approved pa 2017-0405-3267Details
bathroom remodel on ground floor & 2nd floor. replace (e) fixtures in kind (toilet, sink, shower). dry rot repair under previously approved pa 2017-0405-3267 | $19,000 |
| Apr 4, 2017 | Expired or cancelled expired Mar 2026 | 667 San Jose Av | remove and replace dry-rot members. same in kind. not visible to street. plate, studs, joists basement and joist to bathroomDetails
remove and replace dry-rot members. same in kind. not visible to street. plate, studs, joists basement and joist to bathroom | $3,750 |
| Jan 31, 2017 | Expired or cancelled expired Oct 2025 | 2011 18th Av | condition ground floor habitable space. adding bedroom, gym, and bathroom.Details
condition ground floor habitable space. adding bedroom, gym, and bathroom. | $5,000 |
| Oct 13, 2016 | Completed final sign-off Aug 2022 | 50 Surrey St | (front building) add single story,two car garage at front yard. two single rear yard addition. excavate basement level & refinish. interior alteration include renovation of kitchen, powder, basement bath 2nd floor bath. add 1 new bathroom at 2nd fl new dormers at roof. new interior stairs to replaceDetails
(front building) add single story,two car garage at front yard. two single rear yard addition. excavate basement level & refinish. interior alteration include renovation of kitchen, powder, basement bath 2nd floor bath. add 1 new bathroom at 2nd fl new dormers at roof. new interior stairs to replace | $500,000 |
| Sep 9, 2016 | Completed final sign-off Dec 2016 | 19 Hancock St | new bathroom at ground floor.Details
new bathroom at ground floor. | $11,000 |
| Jun 9, 2016 | Completed final sign-off Oct 2016 | 583 Congo St | remodel master bath, master closet, guest bath, reframe entry doorDetails
remodel master bath, master closet, guest bath, reframe entry door | $83,000 |
| Jan 22, 2015 | Never finaled issued Jan 2015, no final | 4150 Cesar Chavez St | comply with complaint 201519371 - remodel kitchen & bath fixtures unit 4Details
comply with complaint 201519371 - remodel kitchen & bath fixtures unit 4 | $10,000 |
| Jul 31, 2013 | Completed final sign-off Jan 2014 | 2270 Market St | work on 3rd floor: 1. removal of non-bearing walls 2. (n) kitchen & bathrooms. 3 high efficacy lighting. 4. voluntary plywood stiffeningDetails
work on 3rd floor: 1. removal of non-bearing walls 2. (n) kitchen & bathrooms. 3 high efficacy lighting. 4. voluntary plywood stiffening | $35,750 |
| Jan 3, 2013 | Completed final sign-off Feb 2013 | 1384 34th Av | bathroom remodel, no framing changes, no wall relocation, new electrical, and plumbing fixtures. permanently installed lights in bathroom shall be high efficacy unless they are controlled by manual on occupancy sensors - cec 150(k)10.Details
bathroom remodel, no framing changes, no wall relocation, new electrical, and plumbing fixtures. permanently installed lights in bathroom shall be high efficacy unless they are controlled by manual on occupancy sensors - cec 150(k)10. | $2,250 |
| Dec 6, 2011 | Completed final sign-off Mar 2012 | 4298 24th St | build out of coffee shop-new handicap bathroom, customer counter & sinks. no structural workDetails
build out of coffee shop-new handicap bathroom, customer counter & sinks. no structural work | $17,000 |
| Nov 2, 2011 | Completed final sign-off Jun 2012 | 2904 24th St | legalize extg hood and place flue 10' from property line,replacing 3 compartment sink,install prep sink,install hand washing sink,bathroom door and ramp,replace front door 36' wide door with automatic opening.remove extg bars from windows.replace front windows with tempered glass.Details
legalize extg hood and place flue 10' from property line,replacing 3 compartment sink,install prep sink,install hand washing sink,bathroom door and ramp,replace front door 36' wide door with automatic opening.remove extg bars from windows.replace front windows with tempered glass. | $2,000 |
| Jan 20, 2011 | Completed final sign-off Jul 2011 | 435 Paris St | 1st. flr.: rebuild interior stairs in-kind to comply w/ code, lower (e) slab to (n) head height @ 8'-6" (except garage). 2nd. flr.: rebuild (e) stairs, remove wall between dining & kitchen & reconfigure (e) walls & doors @ bathroom #1 & bedroom.Details
1st. flr.: rebuild interior stairs in-kind to comply w/ code, lower (e) slab to (n) head height @ 8'-6" (except garage). 2nd. flr.: rebuild (e) stairs, remove wall between dining & kitchen & reconfigure (e) walls & doors @ bathroom #1 & bedroom. | $12,000 |
| Oct 18, 2010 | Completed final sign-off Jun 2011 | 1330 09th Av | remove wall between 2 bathrooms. create 1 handicap bathroom. no structural workDetails
remove wall between 2 bathrooms. create 1 handicap bathroom. no structural work | $5,900 |