Back to kitchen remodel contractors
Applied General Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Nov 2019 to Aug 2026
- Last 24 months
- 15 permits filed
30 permits since 2000: 22 completed, 6 in progress, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
15 kitchen remodel permits: 12 completed, 2 in progress, 1 never finaled. Typically 0 days from filing to permit and 106 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 5, 2026 | In progress issued Aug 2026 | 370 24th Av | lower unit: remodel kitchen- change cabinet & countertop, add recessed lights, no wall remove (same as before) all work in-kind.Details
lower unit: remodel kitchen- change cabinet & countertop, add recessed lights, no wall remove (same as before) all work in-kind. | $30,000 |
| Jun 4, 2026 | In progress issued Jun 2026 | 206 Juanita Wy | basement: add 1 liveing room, 1 full bath, add deck at rear. 1st fl add 2 bedrooms, 2 full baths, family room, laundry and wetbar. 2nd fl relocate kitchen, combine 2 existing bedrooms into master suite, add 1 power roomDetails
basement: add 1 liveing room, 1 full bath, add deck at rear. 1st fl add 2 bedrooms, 2 full baths, family room, laundry and wetbar. 2nd fl relocate kitchen, combine 2 existing bedrooms into master suite, add 1 power room | $100,000 |
| Jan 22, 2026 | Completed final sign-off Jun 2026 | 62 Oneida Av | 1) infill center light well 2nd flr. 2) kitchen & bathroom remodel on the 2nd flr.Details
1) infill center light well 2nd flr. 2) kitchen & bathroom remodel on the 2nd flr. | $30,000 |
| May 28, 2025 | Completed final sign-off Oct 2025 | 419 Felton St | remodel kitchen and two bathroom upstair (replace in-kind). no wall remove. add recessed lighting around the house. add insulation for garage area and sheetrock. replace two windows in front and two windows by the lightwell (replace in-kind).Details
remodel kitchen and two bathroom upstair (replace in-kind). no wall remove. add recessed lighting around the house. add insulation for garage area and sheetrock. replace two windows in front and two windows by the lightwell (replace in-kind). | $65,000 |
| Feb 3, 2025 | Completed final sign-off Mar 2025 | 1715 40th Av | remodel 2nd floor bathroom and kitchen . no layout change wil lbe made or wall removal. in kindDetails
remodel 2nd floor bathroom and kitchen . no layout change wil lbe made or wall removal. in kind | $42,000 |
| Nov 22, 2024 | Completed final sign-off Jan 2025 | 2191 43rd Av | remodel bathroom and kitchen without changing the layouts.Details
remodel bathroom and kitchen without changing the layouts. | $46,000 |
| Nov 21, 2024 | Completed final sign-off Mar 2025 | 179 Del Vale Av | kitchen remodeling: replace cabinets and countertop with the same layout, no wall demolition or construction, dmj 11/21/2024;Details
kitchen remodeling: replace cabinets and countertop with the same layout, no wall demolition or construction, dmj 11/21/2024; | $20,000 |
| Aug 22, 2024 | Completed final sign-off Sep 2024 | 3324 Rivera St | remodel kitchen and bathroom upstairs, in kind. add new subpanel for kitchen and bathroom. i kind remodelDetails
remodel kitchen and bathroom upstairs, in kind. add new subpanel for kitchen and bathroom. i kind remodel | $23,500 |
| Jun 3, 2024 | Completed final sign-off Jul 2024 | 2586 39th Av | upstairs kitchen and bathroom remodel. no layout changeDetails
upstairs kitchen and bathroom remodel. no layout change | $32,000 |
| Jun 22, 2023 | Completed final sign-off Feb 2024 | 117 Stonecrest Dr | rev to bpa#202304135659, reduce window sizes @new kitchen, add bar to kitchen area w/no fixtures, add window @new bathrm, relocate window @bathrm#2-2/f, reduce window bathrm#3, add window @bathrm#1. change shower location bathrm#1, new windows u-factor 0.30. keep door see bpa#200304135659.Details
rev to bpa#202304135659, reduce window sizes @new kitchen, add bar to kitchen area w/no fixtures, add window @new bathrm, relocate window @bathrm#2-2/f, reduce window bathrm#3, add window @bathrm#1. change shower location bathrm#1, new windows u-factor 0.30. keep door see bpa#200304135659. | $2,000 |
| Apr 13, 2023 | Completed final sign-off Feb 2024 | 117 Stonecrest Dr | remove one parking spot to create 2 bedrooms and bathroom, and add a 1/2 bathroom, relocate (e) kitchenDetails
remove one parking spot to create 2 bedrooms and bathroom, and add a 1/2 bathroom, relocate (e) kitchen | $100,000 |
| Aug 10, 2022 | Completed final sign-off Nov 2022 | 2450 31st Av | remodel bathroom in kind and replace kitchen cabinet. painting inside and outsideDetails
remodel bathroom in kind and replace kitchen cabinet. painting inside and outside | $1,000 |
| Aug 30, 2021 | Never finaled issued Nov 2021, no final | 1900 Irving St | rev to pa202001232622 & 202010307798 - revise kitchen equipment, restroom layout and structural plan. as of 9/23/2021 - no exterior work - not callled out in scope but was in page a.4 - not to be in this permit review. (e.o cp 9/23/2021)Details
rev to pa202001232622 & 202010307798 - revise kitchen equipment, restroom layout and structural plan. as of 9/23/2021 - no exterior work - not callled out in scope but was in page a.4 - not to be in this permit review. (e.o cp 9/23/2021) | |
| Jul 30, 2021 | Completed final sign-off Apr 2024 | 610 Holloway Av | rev to pa201808207818. 1/f: reconfigure (e) bathrs & add (n) laundry.2/f: relocate (e) kitchen, add (n) laundry and reconfigure (e) bathroom & (e) powder room.reconfigure (e) 2/f & 3/f stairscase.3/f:reconfigure (e) master bath, add (n) w/c, add 2 dormers, 2 skylights.Details
rev to pa201808207818. 1/f: reconfigure (e) bathrs & add (n) laundry.2/f: relocate (e) kitchen, add (n) laundry and reconfigure (e) bathroom & (e) powder room.reconfigure (e) 2/f & 3/f stairscase.3/f:reconfigure (e) master bath, add (n) w/c, add 2 dormers, 2 skylights. | $60,000 |
| Nov 27, 2019 | Completed final sign-off Apr 2026 | 366 24th Av | new adu unit per ord. 95-17 at first floor. add kitchen, 3 bedrooms, 2 bath and living roomDetails
new adu unit per ord. 95-17 at first floor. add kitchen, 3 bedrooms, 2 bath and living room | $75,000 |