Apex Pro Contractors Inc
- Based in
- San Bruno
- On San Francisco permits
- May 2024 to Jun 2026
- Last 24 months
- 13 permits filed
16 permits since 2000: 14 completed, 2 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
3 stairs permits: 2 completed, 1 in progress. Typically 23 days from filing to permit and 356 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 16, 2026 | In progress issued Jun 2026 | 962 Prague St | relocate ext stair, remodel kitchen & bathrm, replace fp with electrical fp, add new bathrm on the 2nd fl, enlarge family rm w/ bar sink, countertop & 2-burner cooktop, add (n)bedrm & bathrm, remodel bathrm on 1st fl, replace wh & furnace, replace rear stair w/ (n) deck & stair, install (n) sidingDetails
relocate ext stair, remodel kitchen & bathrm, replace fp with electrical fp, add new bathrm on the 2nd fl, enlarge family rm w/ bar sink, countertop & 2-burner cooktop, add (n)bedrm & bathrm, remodel bathrm on 1st fl, replace wh & furnace, replace rear stair w/ (n) deck & stair, install (n) siding | $200,000 |
| Oct 21, 2024 | Completed final sign-off Dec 2025 | 2224 Lawton St | 2nd flr: complete remodel kitchen, re-configure interior stair & 2 skylights. 1st flr: remodel bathroom, add 1 bedroom, add 834 conditioned space. remove and replace siding at rear and right of bldg. repair foundation.Details
2nd flr: complete remodel kitchen, re-configure interior stair & 2 skylights. 1st flr: remodel bathroom, add 1 bedroom, add 834 conditioned space. remove and replace siding at rear and right of bldg. repair foundation. | $160,000 |
| May 3, 2024 | Completed final sign-off Apr 2025 | 714 Shields St | 1/f: add 2 bedrooms, 1 full bath and media room. 2/f: remodel kitchen and bathroom. add 1 full bathroom. relocate interior stairs.Details
1/f: add 2 bedrooms, 1 full bath and media room. 2/f: remodel kitchen and bathroom. add 1 full bathroom. relocate interior stairs. | $85,000 |