Back to kitchen remodel contractors
Apex Plumbing & Mechanical *Check Id*
- Based in
- San Francisco
- On San Francisco permits
- Aug 2012 to Mar 2014
- Last 24 months
- 0 permits filed
5 permits since 2000: 5 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
1 kitchen remodel permit: 1 completed. Typically 0 days from filing to permit and 56 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 4, 2014 | Completed final sign-off Apr 2014 | 219 Paris St | replace kitchen sink with new. replace shower pan and toilet with new. repair approx. 50 sf shsingle roofing. plumbing under separate permit.Details
replace kitchen sink with new. replace shower pan and toilet with new. repair approx. 50 sf shsingle roofing. plumbing under separate permit. | $5,000 |