Apex Construction
- Based in
- San Pablo
- On San Francisco permits
- Aug 2001 to Oct 2004
- Last 24 months
- 0 permits filed
8 permits since 2000: 4 completed, 1 never finaled, 3 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for roof deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Roof deck permits
1 roof deck permit: 1 completed. Typically 153 days from filing to permit and 42 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 5, 2002 | Completed final sign-off Jun 2003 | 141 Stonecrest Dr | at (e) roof deck, install pre- engineered patio enclosure (non habitable space)Details
at (e) roof deck, install pre- engineered patio enclosure (non habitable space) | $9,800 |