Back to bathroom remodel contractors
Apex America Gc Inc
- Based in
- San Francisco
- On San Francisco permits
- Nov 2019 to Sep 2024
- Last 24 months
- 0 permits filed
27 permits since 2000: 15 completed, 6 in progress, 2 never finaled, 4 expired or cancelled.
Of the 2 never-finaled permits, 2 are 3 to 5 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
8 bathroom remodel permits: 6 completed, 1 in progress, 1 never finaled. Typically 13 days from filing to permit and 192 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 31, 2023 | In progress issued Oct 2023 | 572 Chestnut St | limited demolition of interior partitions walls within a four unit apartment bldg. on 2nd and 3rd fl units, replacement of kitchen & bathrooms. addition of one bathroom per unit. provide new beams and posts to support (e) floor and roof framing where interior bearing walls are to be demo. voluntaryDetails
limited demolition of interior partitions walls within a four unit apartment bldg. on 2nd and 3rd fl units, replacement of kitchen & bathrooms. addition of one bathroom per unit. provide new beams and posts to support (e) floor and roof framing where interior bearing walls are to be demo. voluntary | $150,000 |
| Mar 28, 2022 | Completed final sign-off Nov 2022 | 573 Lombard St | limited demo of non structural. interior partition walls, replacement of kitchen and bath casework and fixtures.Details
limited demo of non structural. interior partition walls, replacement of kitchen and bath casework and fixtures. | $15,000 |
| Mar 25, 2022 | Completed final sign-off Apr 2022 | 380 14th St | unit #405: one shower bathroom remodel (convert tub to shower) non structuralDetails
unit #405: one shower bathroom remodel (convert tub to shower) non structural | $7,000 |
| Jan 10, 2022 | Never finaled issued Jan 2022, no final | 1263 Oak St | bathroom remodel, non structural. apt 1.Details
bathroom remodel, non structural. apt 1. | $7,000 |
| Oct 28, 2021 | Completed final sign-off Dec 2021 | 380 14th St | unit 503. one shower bathroom remodel (convert tub to shower) non structuralDetails
unit 503. one shower bathroom remodel (convert tub to shower) non structural | $7,000 |
| Sep 20, 2021 | Completed final sign-off Nov 2022 | 1439 Leavenworth St | unit #1 & #2:remodel of 2 residential units on the 2nd floor to include, remodeled kitchen and bath, the addition of on new bath in each of the units.Details
unit #1 & #2:remodel of 2 residential units on the 2nd floor to include, remodeled kitchen and bath, the addition of on new bath in each of the units. | $50,000 |
| May 19, 2021 | Completed final sign-off Aug 2023 | 50 Alta St | apt #6: limited demolition of interior partition walls. kitchen and bathrooms replacement & limited construction of new interior partition walls. no exterior workDetails
apt #6: limited demolition of interior partition walls. kitchen and bathrooms replacement & limited construction of new interior partition walls. no exterior work | $20,000 |
| Jan 8, 2021 | Completed final sign-off Sep 2021 | 24 Carnelian Wy | 2 floor residential remodel. ktichen & 2.5 bath remodel. new walkin closet & enclosed vanity in master bedroom.Details
2 floor residential remodel. ktichen & 2.5 bath remodel. new walkin closet & enclosed vanity in master bedroom. | $100,000 |