Back to kitchen remodel contractors
Anthony Lynch
- Based in
- San Francisco
- On San Francisco permits
- May 2000 to Feb 2024
- Last 24 months
- 0 permits filed
64 permits since 2000: 44 completed, 7 never finaled, 13 expired or cancelled.
Of the 7 never-finaled permits, 2 are 5 to 10 years old, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
11 kitchen remodel permits: 7 completed, 2 never finaled, 2 expired or cancelled. Typically 0 days from filing to permit and 254 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 6, 2022 | Completed final sign-off Jul 2023 | 337 Frederick St | renovation of (e) (1) kitchen & (1)bathroom, replace cabinets, fixtures & tile, replace (1) window @ side lightwell, not visible to streetDetails
renovation of (e) (1) kitchen & (1)bathroom, replace cabinets, fixtures & tile, replace (1) window @ side lightwell, not visible to street | $30,000 |
| Oct 15, 2018 | Completed final sign-off Aug 2020 | 448 Lyon St | reconfigure layout on 2nd & 3rd flrs; at 2nd floor, renovate (e) full bath, relocate master suite from 3rd to 2nd. relocate kitchen to 3rd fl; add 1/2 bath at 3rd floor w/(n) roof dormer, some (n) lighting, roof framing replacement on interior w/ (n) scissor truss system. replace 9 windows at front.Details
reconfigure layout on 2nd & 3rd flrs; at 2nd floor, renovate (e) full bath, relocate master suite from 3rd to 2nd. relocate kitchen to 3rd fl; add 1/2 bath at 3rd floor w/(n) roof dormer, some (n) lighting, roof framing replacement on interior w/ (n) scissor truss system. replace 9 windows at front. | $400,000 |
| Feb 2, 2018 | Never finaled issued Feb 2018, no final | 2070 Mcallister St | kitchen & bathroom renovation: replace fixtures, tile and cabinets on 2/f. open sheetrock a garage for plumbing & electric. install 5/8in type -x.Details
kitchen & bathroom renovation: replace fixtures, tile and cabinets on 2/f. open sheetrock a garage for plumbing & electric. install 5/8in type -x. | $30,000 |
| Nov 16, 2011 | Completed final sign-off May 2012 | 430 Fair Oaks St | 2nd floor enlarge & renovateexisting kitchen. relocate 1 existing full bath, add 1 new full bath.Details
2nd floor enlarge & renovateexisting kitchen. relocate 1 existing full bath, add 1 new full bath. | $85,000 |
| Aug 27, 2010 | Completed final sign-off May 2011 | 339 Frederick St | interior renovation including kitchen & 2 baths. remove walls btwn dining rm, hjall & lvrm. replace 10 exist'g windows & 1 ext. door.Details
interior renovation including kitchen & 2 baths. remove walls btwn dining rm, hjall & lvrm. replace 10 exist'g windows & 1 ext. door. | $75,000 |
| Jan 6, 2006 | Completed final sign-off Jan 2007 | 226 Palo Alto Av | kitchen remodel, bath remodel, addition of 2 new bdrm and 2 bathrooms in basement, some new lighting, drywall and windowsDetails
kitchen remodel, bath remodel, addition of 2 new bdrm and 2 bathrooms in basement, some new lighting, drywall and windows | $100,000 |
| Aug 12, 2005 | Expired or cancelled expired Dec 2010 | 1730 Fell St | install new kitchen cabinets, new sheetrock on walls. install new bath & toilet & vanity & fan.Details
install new kitchen cabinets, new sheetrock on walls. install new bath & toilet & vanity & fan. | $15,000 |
| Mar 3, 2004 | Never finaled issued Mar 2004, no final | 349 Frederick St | new kitchen,new bath,stair case to lower bedroom,replace (e)windows with new,doors & trim,removeDetails
new kitchen,new bath,stair case to lower bedroom,replace (e)windows with new,doors & trim,remove | $80,000 |
| Dec 31, 2003 | Expired or cancelled expired Jul 2004 | 16 Divisadero St | new kitchen, three bathrms, basement bedrm. hardwood floorDetails
new kitchen, three bathrms, basement bedrm. hardwood floor | $100,000 |
| Feb 5, 2003 | Completed final sign-off Oct 2003 | 18 Divisadero St | kitchen cabinets, new bathroom, new walls, trim closet, new lam beamDetails
kitchen cabinets, new bathroom, new walls, trim closet, new lam beam | $100,000 |
| Dec 12, 2002 | Completed final sign-off Oct 2003 | 18 Divisadero St | abate violation#200009669 remove bathroom/kitchen sink/cabinets/all interior partition wall,Details
abate violation#200009669 remove bathroom/kitchen sink/cabinets/all interior partition wall, | $6,000 |