Annin Construction
- Based in
- San Francisco
- On San Francisco permits
- Sep 2000 to Jun 2016
- Last 24 months
- 0 permits filed
16 permits since 2000: 12 completed, 2 never finaled, 2 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 28, 2016 | Completed final sign-off Feb 2017 | 634 05th Av | replace old 2x3 stud framing with new 2x4 framing. replace unsafe aluminum sliding door at rear bedroom with new window 8ft long. revision to app#201509046222. relocate pantry wall, rebuild closet framing, remove pocket door. replace doors and trim.Details
replace old 2x3 stud framing with new 2x4 framing. replace unsafe aluminum sliding door at rear bedroom with new window 8ft long. revision to app#201509046222. relocate pantry wall, rebuild closet framing, remove pocket door. replace doors and trim. | $5,000 |
| May 10, 2016 | Completed final sign-off Mar 2017 | 634 05th Av | replace existing aluminum windows with new sash. true wood or aluminum-clad marvin tilt-pac at front, rear of any material. dual-glazed sash. replace two front doors. all within existing opennigs.Details
replace existing aluminum windows with new sash. true wood or aluminum-clad marvin tilt-pac at front, rear of any material. dual-glazed sash. replace two front doors. all within existing opennigs. | $2,000 |
| Sep 4, 2015 | Completed final sign-off Feb 2017 | 634 05th Av | bathroom remodek: replace fixtures,toilet,vanity sink & cabinets. no new wall & no (e)wall relocation. new electrical sub-panel & copper plumbing. replace sheet rock with 5/8" type x gyp bd nailed with cooler nails at not more than 7" o.c. lighting in bathroom remodel shall comply w/cec 150.0(k)5.Details
bathroom remodek: replace fixtures,toilet,vanity sink & cabinets. no new wall & no (e)wall relocation. new electrical sub-panel & copper plumbing. replace sheet rock with 5/8" type x gyp bd nailed with cooler nails at not more than 7" o.c. lighting in bathroom remodel shall comply w/cec 150.0(k)5. | $50,000 |
| Aug 1, 2014 | Never finaled issued Jan 2015, no final | 227 03rd Av | horizontal addition. this permit submittal is for exterior demolition and constuction of new stair and deck.Details
horizontal addition. this permit submittal is for exterior demolition and constuction of new stair and deck. | $22,000 |
| May 17, 2012 | Completed final sign-off Jul 2012 | 154 20th Av | replace in kind lightwell. 2nd means of egress. use pressure treated material.Details
replace in kind lightwell. 2nd means of egress. use pressure treated material. | $10,000 |
| Aug 12, 2011 | Completed final sign-off Apr 2015 | 256 03rd Av | installation of (n) copper waterservice replacement for (e) galv supply. remove of (e) concrete flags and install of (n) flags. remove and replace lightinng for access (sensor light). remove and repalce wood siding for access. tie in to (e0 water meterDetails
installation of (n) copper waterservice replacement for (e) galv supply. remove of (e) concrete flags and install of (n) flags. remove and replace lightinng for access (sensor light). remove and repalce wood siding for access. tie in to (e0 water meter | $2,000 |
| Aug 3, 2010 | Completed final sign-off Oct 2010 | 781 11th Av | replace "in-kind" (e) rear of bldg. balconies (@ ea. liv. area) from rear bedrooms.Details
replace "in-kind" (e) rear of bldg. balconies (@ ea. liv. area) from rear bedrooms. | $14,000 |
| Sep 7, 2007 | Completed final sign-off Nov 2007 | 2083 28th Av | minor repair stucco work on side of house due to damage by neighbor. repair at deck in yard less than 3 ft. off ground. repalcement of skylight in bathroom. extension of chimney flue due to consturciton of addition next door. to comply w/n.o.v. #200703781.Details
minor repair stucco work on side of house due to damage by neighbor. repair at deck in yard less than 3 ft. off ground. repalcement of skylight in bathroom. extension of chimney flue due to consturciton of addition next door. to comply w/n.o.v. #200703781. | $2,360 |
| Feb 27, 2006 | Completed final sign-off Apr 2006 | 1275 Union St | to renew pa#200503046756,#200408020316,#200304112107 for final inspectionDetails
to renew pa#200503046756,#200408020316,#200304112107 for final inspection | |
| Feb 27, 2006 | Completed final sign-off Apr 2006 | 1277 Union St | to renew pa#2003/03/06/9015 & 20000106363 for final inspectionDetails
to renew pa#2003/03/06/9015 & 20000106363 for final inspection | |
| Mar 4, 2005 | Never finaled issued Mar 2005, no final | 1277 Union St | renew for final inspection - 200408020316.Details
renew for final inspection - 200408020316. | |
| Mar 6, 2003 | Completed final sign-off Apr 2003 | 1275 Union St | 9719657,9720029,9814103 renew for final inspection (per 3-r 3831, item 2)Details
9719657,9720029,9814103 renew for final inspection (per 3-r 3831, item 2) | |
| Mar 6, 2003 | Completed final sign-off Apr 2003 | 1275 Union St | 9914345,200001060363,9806508 renew permit for final inspection per 3r-3731,item 2Details
9914345,200001060363,9806508 renew permit for final inspection per 3r-3731,item 2 | |
| Mar 6, 2003 | Completed final sign-off Apr 2003 | 1275 Union St | renew app for final application 9700442,9701375,9703629 per 3r-3731,item 2Details
renew app for final application 9700442,9701375,9703629 per 3r-3731,item 2 | |
| Mar 6, 2003 | Expired or cancelled expired Jan 2006 | 1277 Union St | comply with 3r-3731 for condominium conversionDetails
comply with 3r-3731 for condominium conversion | $3,000 |
| Sep 19, 2000 | Expired or cancelled expired Jul 2001 | 252 03rd Av | remodel bathroom,no wall or door changesDetails
remodel bathroom,no wall or door changes | $10,000 |