Block 1640, lot 042
634 05th Ave
- City’s use
- Multi-Family Residential
- Built
- 1908
- Stories
- 2
- Units
- 3
- Rooms
- 3 bathrooms
- Building
- 3,340 sq ft
- Lot
- 2,996 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
4 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 28, 2016 | Completed final sign-off Feb 2017 | 634 05th Av | Annin Construction | replace old 2x3 stud framing with new 2x4 framing. replace unsafe aluminum sliding door at rear bedroom with new window 8ft long. revision to app#201509046222. relocate pantry wall, rebuild closet framing, remove pocket door. replace doors and trim.Details
replace old 2x3 stud framing with new 2x4 framing. replace unsafe aluminum sliding door at rear bedroom with new window 8ft long. revision to app#201509046222. relocate pantry wall, rebuild closet framing, remove pocket door. replace doors and trim. | $5,000 |
| May 10, 2016 | Completed final sign-off Mar 2017 | 634 05th Av | Annin Construction | replace existing aluminum windows with new sash. true wood or aluminum-clad marvin tilt-pac at front, rear of any material. dual-glazed sash. replace two front doors. all within existing opennigs.Details
replace existing aluminum windows with new sash. true wood or aluminum-clad marvin tilt-pac at front, rear of any material. dual-glazed sash. replace two front doors. all within existing opennigs. | $2,000 |
| Sep 4, 2015 | Completed final sign-off Feb 2017 | 634 05th Av | Annin Construction | bathroom remodek: replace fixtures,toilet,vanity sink & cabinets. no new wall & no (e)wall relocation. new electrical sub-panel & copper plumbing. replace sheet rock with 5/8" type x gyp bd nailed with cooler nails at not more than 7" o.c. lighting in bathroom remodel shall comply w/cec 150.0(k)5.Details
bathroom remodek: replace fixtures,toilet,vanity sink & cabinets. no new wall & no (e)wall relocation. new electrical sub-panel & copper plumbing. replace sheet rock with 5/8" type x gyp bd nailed with cooler nails at not more than 7" o.c. lighting in bathroom remodel shall comply w/cec 150.0(k)5. | $50,000 |
| Oct 26, 2000 | Completed final sign-off Apr 2025 | 636 05th Av | structural rev to 2000 07 13 5077s (rigid framing,joist package)Details
structural rev to 2000 07 13 5077s (rigid framing,joist package) | $7,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Annin Construction (3)
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.