Back to bathroom remodel contractors
Andrew Mihailovsky
- Based in
- San Francisco
- On San Francisco permits
- Feb 2002 to Jan 2026
- Last 24 months
- 3 permits filed
34 permits since 2000: 28 completed, 3 never finaled, 3 expired or cancelled.
Of the 3 never-finaled permits, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
3 bathroom remodel permits: 2 completed, 1 expired or cancelled. Typically 0 days from filing to permit and 219 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 13, 2017 | Completed final sign-off Dec 2017 | 1346 28th Av | remodel bathroom & water closet. no structural work. replace in kind fixtures, walls, tile, replace windows in kind. not visible from street. no wall modifications.Details
remodel bathroom & water closet. no structural work. replace in kind fixtures, walls, tile, replace windows in kind. not visible from street. no wall modifications. | $2,500 |
| Dec 17, 2008 | Expired or cancelled expired Sep 2015 | 753 Baker St | work @ unit# 753 only. remodel bathroom. new bathtub & tile surround (replace). replace vanity & toilet, new vent, new hot water heater. bathroom located on 3rd floor.Details
work @ unit# 753 only. remodel bathroom. new bathtub & tile surround (replace). replace vanity & toilet, new vent, new hot water heater. bathroom located on 3rd floor. | $11,500 |
| Nov 8, 2002 | Completed final sign-off Aug 2003 | 50 San Gabriel Av | reinstall legal bathroom on 1st floor. finish storage space on 1st floorDetails
reinstall legal bathroom on 1st floor. finish storage space on 1st floor | $10,000 |