Andrew Mark Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Aug 2010 to Apr 2026
- Last 24 months
- 4 permits filed
57 permits since 2000: 32 completed, 3 in progress, 17 never finaled, 5 expired or cancelled.
Of the 17 never-finaled permits, 3 are 3 to 5 years old, 9 are 5 to 10 years old, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
5 deck permits: 3 completed, 2 never finaled. Typically 191 days from filing to permit and 435 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 18, 2023 | Completed final sign-off Mar 2026 | 1227 47th Av | renovation (e) 2nd and 3rd levels. 0 sf added. new flat roof w/ deck at (e) 2nd fl roof. remove rear roof dormers and replace w/ pitch roof to match (e), new rear gable wall. new toilet and lav on 3rd lv, new laundry closet on 2nd level. replace roof. replace selectDetails
renovation (e) 2nd and 3rd levels. 0 sf added. new flat roof w/ deck at (e) 2nd fl roof. remove rear roof dormers and replace w/ pitch roof to match (e), new rear gable wall. new toilet and lav on 3rd lv, new laundry closet on 2nd level. replace roof. replace select | $300,000 |
| Jun 15, 2022 | Never finaled issued Jun 2022, no final | 2831 Laguna St | repair and replace existing rear deck at 2nd floor, same size/in kind. (original pa#8713659) less than 50%Details
repair and replace existing rear deck at 2nd floor, same size/in kind. (original pa#8713659) less than 50% | $15,000 |
| Nov 24, 2021 | Completed final sign-off Aug 2024 | 1125 Broderick St | exterior work: remove (e) retractable skylight. provide new roof top stair enclosure with windows & skylights. replace in kind (e) roof deck. provide new transparent glass windscreens & guardrails on (e) deck. interior work: replace (e) roof access stair. renovate 1st fl entry stair.Details
exterior work: remove (e) retractable skylight. provide new roof top stair enclosure with windows & skylights. replace in kind (e) roof deck. provide new transparent glass windscreens & guardrails on (e) deck. interior work: replace (e) roof access stair. renovate 1st fl entry stair. | $200,000 |
| Oct 26, 2016 | Never finaled issued Mar 2018, no final | 80 Linda St | 1st flr. relocate bathroom & laundry sink. 2nd flr-relocate kitchen,remodel (e) bathroom, demo rear addition. 3rd flr.veticle addition to include 3 bedrooms,2 full baths & rear deck <500 sq ft.Details
1st flr. relocate bathroom & laundry sink. 2nd flr-relocate kitchen,remodel (e) bathroom, demo rear addition. 3rd flr.veticle addition to include 3 bedrooms,2 full baths & rear deck <500 sq ft. | $50,000 |
| Dec 1, 2015 | Completed final sign-off Apr 2016 | 3815 Market St | deck dry rot replacement and deck addition, replace old decks in kind.Details
deck dry rot replacement and deck addition, replace old decks in kind. | $25,000 |