Back to bathroom remodel contractors
Andrew Durosette Aka Cfi Construction
- Based in
- Ceres
- On San Francisco permits
- May 2016 to Mar 2021
- Last 24 months
- 0 permits filed
8 permits since 2000: 3 completed, 5 never finaled.
Of the 5 never-finaled permits, 5 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
5 bathroom remodel permits: 2 completed, 3 never finaled. Typically 196 days from filing to permit and 1334 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 19, 2018 | Completed final sign-off Mar 2022 | 1325 Kansas St | add interior stairs between 1st & 2nd stories; remodel 1st story, remodel bath at 2nd story. new windows at 1st story.Details
add interior stairs between 1st & 2nd stories; remodel 1st story, remodel bath at 2nd story. new windows at 1st story. | $80,000 |
| Mar 30, 2018 | Never finaled issued May 2018, no final | 3653 20th St | interior remodel of 2nd story (unit #1) kitchen, new full bath, new half bath with laundry.Details
interior remodel of 2nd story (unit #1) kitchen, new full bath, new half bath with laundry. | $40,000 |
| Jan 18, 2018 | Never finaled issued Feb 2018, no final | 58 Surrey St | interior remodel at 1st floor, relocate extg kitchen, replace extg window and exterior patio door. relocate half bath and add shower. at 2nd floor remodel 2 exg baths. add skylight. new furnace and water heater. repair (e) deck, less than 50%.Details
interior remodel at 1st floor, relocate extg kitchen, replace extg window and exterior patio door. relocate half bath and add shower. at 2nd floor remodel 2 exg baths. add skylight. new furnace and water heater. repair (e) deck, less than 50%. | $93,000 |
| Jul 20, 2017 | Completed final sign-off Sep 2022 | 3676 22nd St | horizontal addition. remodel (e) 2-unit bldg. 3676-a: add bathroom, relocate kitchen, bedroom & living room. 3676: (n) foyer on 1st fl. additional square footage on 2nd fl. reconfigure kitchen/dining, study & bath. relocate stair to 3rd fl. on 3rd fl: additional bedroom & bath.(n) deck & sq footageDetails
horizontal addition. remodel (e) 2-unit bldg. 3676-a: add bathroom, relocate kitchen, bedroom & living room. 3676: (n) foyer on 1st fl. additional square footage on 2nd fl. reconfigure kitchen/dining, study & bath. relocate stair to 3rd fl. on 3rd fl: additional bedroom & bath.(n) deck & sq footage | $360,000 |
| May 10, 2016 | Never finaled issued Nov 2016, no final | 1904 Greenwich St | 1st horizontal rear addition: relocate (e) family room, & (e) bedroom, upgrade (e) bathroom. in 2nd floor addition: enlarge (e) bedroom, add internal stair connects 1st & 2nd floor.legaize (e) rooms and bath in 1st floor.Details
1st horizontal rear addition: relocate (e) family room, & (e) bedroom, upgrade (e) bathroom. in 2nd floor addition: enlarge (e) bedroom, add internal stair connects 1st & 2nd floor.legaize (e) rooms and bath in 1st floor. | $50,000 |