Permit GraphShortlistSan Francisco building permits since 2000

Andrew Durosette Aka Cfi Construction

Contractor license
1005093
State license record
Based in
Ceres
On San Francisco permits
May 2016 to Mar 2021
Last 24 months
0 permits filed

8 permits since 2000: 3 completed, 5 never finaled.

Of the 5 never-finaled permits, 5 are 5 to 10 years old.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Most recent permits

AllDeck 2Stairs 3Kitchen remodel 3Bathroom remodel 5
FiledOutcomeAddressWork described on the permitDeclared cost
Mar 11, 2021Never finaled
issued Mar 2021, no final
1904 Greenwich Stto obtain final inspection for work performe under permit application# 201605107078.
Details
Permit
202103116321
Status
issued
Filed
Mar 11, 2021
Permit issued
Mar 12, 2021
Declared cost
$120,000
Address
1904 Greenwich St

to obtain final inspection for work performe under permit application# 201605107078.

Open the permit page

$120,000
Aug 13, 2020Completed
final sign-off Sep 2020
3653 20th Stto renew 201803305071 & 201804105951. all work complete.
Details
Permit
202008131726
Status
complete
Filed
Aug 13, 2020
Permit issued
Aug 27, 2020
Final sign-off
Sep 15, 2020
Declared cost
$50,000
Address
3653 20th St

to renew 201803305071 & 201804105951. all work complete.

Open the permit page

$50,000
Apr 19, 2018Completed
final sign-off Mar 2022
1325 Kansas Stadd interior stairs between 1st & 2nd stories; remodel 1st story, remodel bath at 2nd story. new windows at 1st story.
Details
Permit
201804196741
Status
complete
Filed
Apr 19, 2018
Permit issued
Feb 11, 2019
Final sign-off
Mar 18, 2022
Declared cost
$80,000
Address
1325 Kansas St

add interior stairs between 1st & 2nd stories; remodel 1st story, remodel bath at 2nd story. new windows at 1st story.

Open the permit page

$80,000
Apr 10, 2018Never finaled
issued Dec 2018, no final
3653 20th Strevision to pa201703305071: change rear exterior pair of doors to a single hinged door. replace (e) window with escape window @ same size. convert (e) office to bedroom.
Details
Permit
201804105951
Status
issued
Filed
Apr 10, 2018
Permit issued
Dec 28, 2018
Declared cost
$5,000
Address
3653 20th St

revision to pa201703305071: change rear exterior pair of doors to a single hinged door. replace (e) window with escape window @ same size. convert (e) office to bedroom.

Open the permit page

$5,000
Mar 30, 2018Never finaled
issued May 2018, no final
3653 20th Stinterior remodel of 2nd story (unit #1) kitchen, new full bath, new half bath with laundry.
Details
Permit
201803305071
Status
issued
Filed
Mar 30, 2018
Permit issued
May 14, 2018
Declared cost
$40,000
Address
3653 20th St

interior remodel of 2nd story (unit #1) kitchen, new full bath, new half bath with laundry.

Open the permit page

$40,000
Jan 18, 2018Never finaled
issued Feb 2018, no final
58 Surrey Stinterior remodel at 1st floor, relocate extg kitchen, replace extg window and exterior patio door. relocate half bath and add shower. at 2nd floor remodel 2 exg baths. add skylight. new furnace and water heater. repair (e) deck, less than 50%.
Details
Permit
201801188916
Status
issued
Filed
Jan 18, 2018
Permit issued
Feb 8, 2018
Declared cost
$93,000
Address
58 Surrey St

interior remodel at 1st floor, relocate extg kitchen, replace extg window and exterior patio door. relocate half bath and add shower. at 2nd floor remodel 2 exg baths. add skylight. new furnace and water heater. repair (e) deck, less than 50%.

Open the permit page

$93,000
Jul 20, 2017Completed
final sign-off Sep 2022
3676 22nd Sthorizontal addition. remodel (e) 2-unit bldg. 3676-a: add bathroom, relocate kitchen, bedroom & living room. 3676: (n) foyer on 1st fl. additional square footage on 2nd fl. reconfigure kitchen/dining, study & bath. relocate stair to 3rd fl. on 3rd fl: additional bedroom & bath.(n) deck & sq footage
Details
Permit
201707202530
Status
complete
Filed
Jul 20, 2017
Permit issued
Jun 26, 2018
Final sign-off
Sep 9, 2022
Declared cost
$360,000
Address
3676 22nd St

horizontal addition. remodel (e) 2-unit bldg. 3676-a: add bathroom, relocate kitchen, bedroom & living room. 3676: (n) foyer on 1st fl. additional square footage on 2nd fl. reconfigure kitchen/dining, study & bath. relocate stair to 3rd fl. on 3rd fl: additional bedroom & bath.(n) deck & sq footage

Open the permit page

$360,000
May 10, 2016Never finaled
issued Nov 2016, no final
1904 Greenwich St1st horizontal rear addition: relocate (e) family room, & (e) bedroom, upgrade (e) bathroom. in 2nd floor addition: enlarge (e) bedroom, add internal stair connects 1st & 2nd floor.legaize (e) rooms and bath in 1st floor.
Details
Permit
201605107078
Status
issued
Filed
May 10, 2016
Permit issued
Nov 22, 2016
Declared cost
$50,000
Address
1904 Greenwich St

1st horizontal rear addition: relocate (e) family room, & (e) bedroom, upgrade (e) bathroom. in 2nd floor addition: enlarge (e) bedroom, add internal stair connects 1st & 2nd floor.legaize (e) rooms and bath in 1st floor.

Open the permit page

$50,000