Back to kitchen remodel contractors
Andonian Construction
- Based in
- Millbrae
- On San Francisco permits
- Nov 2004 to Nov 2019
- Last 24 months
- 0 permits filed
16 permits since 2000: 13 completed, 3 never finaled.
Of the 3 never-finaled permits, 2 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
2 kitchen remodel permits: 2 completed. Typically 355 days from filing to permit and 431 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 22, 2015 | Completed final sign-off Sep 2017 | 1354 27th Av | legalize 1st floor unit per zoning permitted. renovation: 1st floor - entrance door & kitchen relocation. 2nd floor: fill lightwell, add full bath. rebuild rear stair.Details
legalize 1st floor unit per zoning permitted. renovation: 1st floor - entrance door & kitchen relocation. 2nd floor: fill lightwell, add full bath. rebuild rear stair. | $35,000 |
| Jun 7, 2006 | Completed final sign-off Apr 2008 | 2383 15th Av | horizontal expansion at rear of residence at lower & main level. replace (e) front windows with bay window. remodel (e) kitchen with new cabinets, countertops & appliances & new bathroomDetails
horizontal expansion at rear of residence at lower & main level. replace (e) front windows with bay window. remodel (e) kitchen with new cabinets, countertops & appliances & new bathroom | $175,000 |