Back to kitchen remodel contractors
Andiamo Construction
- Based in
- Hollister
- On San Francisco permits
- May 2007 to Aug 2007
- Last 24 months
- 0 permits filed
2 permits since 2000: 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
1 kitchen remodel permit: 1 expired or cancelled. Typically 0 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 30, 2007 | Expired or cancelled expired Aug 2009 | 256 Pennsylvania Av | work on unit#2 onlu. bathroom remodel. install vanity where shower is currently. install shower where bathtub is currently. remove wall between current vanity and current shower. kitchen remodel. replace cabinets and granite.Details
work on unit#2 onlu. bathroom remodel. install vanity where shower is currently. install shower where bathtub is currently. remove wall between current vanity and current shower. kitchen remodel. replace cabinets and granite. | $20,000 |