Anderson - Niswander Seismic Retrofit In
- Based in
- La Honda
- On San Francisco permits
- Mar 2013 to Nov 2013
- Last 24 months
- 0 permits filed
6 permits since 2000: 5 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
1 stairs permit: 1 completed. Typically 9 days from filing to permit and 70 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 27, 2013 | Completed final sign-off Feb 2014 | 419 Prentiss St | voluntary strengthening of cripple wall bracing - mudsill bolting & connections to framing above cripple walls & strengthening at 1st floor stair opening. work is confined to crawl space & lower floor area.Details
voluntary strengthening of cripple wall bracing - mudsill bolting & connections to framing above cripple walls & strengthening at 1st floor stair opening. work is confined to crawl space & lower floor area. | $20,000 |