American Vision Windows
- Based in
- Simi Valley
- On San Francisco permits
- Aug 2005 to Aug 2026
- Last 24 months
- 12 permits filed
186 permits since 2000: 102 completed, 10 in progress, 55 never finaled, 19 expired or cancelled.
Of the 55 never-finaled permits, 4 are 3 to 5 years old, 20 are 5 to 10 years old, 31 are over 10 years old. 2 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
1 deck permit: 1 in progress. Typically 0 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 7, 2026 | In progress issued Jan 2026 | 611 Washington St | install new walk-in bathtub in existing tub location. move 2 receptacles to new location, frame deck to new height for walk-in bath, like for like.Details
install new walk-in bathtub in existing tub location. move 2 receptacles to new location, frame deck to new height for walk-in bath, like for like. | $33,000 |