Back to bathroom remodel contractors
American Vision Windows
- Based in
- Simi Valley
- On San Francisco permits
- Aug 2005 to Aug 2026
- Last 24 months
- 12 permits filed
186 permits since 2000: 102 completed, 10 in progress, 55 never finaled, 19 expired or cancelled.
Of the 55 never-finaled permits, 4 are 3 to 5 years old, 20 are 5 to 10 years old, 31 are over 10 years old. 2 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
12 bathroom remodel permits: 6 completed, 3 in progress, 3 never finaled. Typically 0 days from filing to permit and 42 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 6, 2026 | In progress issued Aug 2026 | 239 Brannan St | unit# 17g: guest bathroom remodel - tub to shower base conversion same drain location, no alteration to (e) footprint; replace valve; install non-pourous stone composite wall kit.Details
unit# 17g: guest bathroom remodel - tub to shower base conversion same drain location, no alteration to (e) footprint; replace valve; install non-pourous stone composite wall kit. | $19,000 |
| Jan 7, 2026 | In progress issued Jan 2026 | 611 Washington St | install new walk-in bathtub in existing tub location. move 2 receptacles to new location, frame deck to new height for walk-in bath, like for like.Details
install new walk-in bathtub in existing tub location. move 2 receptacles to new location, frame deck to new height for walk-in bath, like for like. | $33,000 |
| May 30, 2024 | Completed final sign-off Aug 2024 | 950 Columbus Av | #4: like for like shower replacement with kohler luxstone non-porous wall system. replacing one 1 outlet with gfi outlet in same bathroom.Details
#4: like for like shower replacement with kohler luxstone non-porous wall system. replacing one 1 outlet with gfi outlet in same bathroom. | $12,750 |
| May 29, 2024 | Completed final sign-off Jul 2024 | 821 Folsom St | like for like shower replacement with kohler luxstone non porus wall slystem replacing (1) outlet with gfi outlet in same bathroomDetails
like for like shower replacement with kohler luxstone non porus wall slystem replacing (1) outlet with gfi outlet in same bathroom | $13,588 |
| Nov 15, 2023 | In progress issued Nov 2023 | 855 La Playa | #157: partial bathroom remodel (non structural). remove existing shower and replace with new kohler shower pan and wall system. change out elec. outlets for new gfci outlets same size and location for all work. (e) vanity and (e) toilet to remain.Details
#157: partial bathroom remodel (non structural). remove existing shower and replace with new kohler shower pan and wall system. change out elec. outlets for new gfci outlets same size and location for all work. (e) vanity and (e) toilet to remain. | $15,246 |
| Jan 27, 2023 | Never finaled issued Jan 2023, no final | 188 Minna St | unit 23d: replace hall bathroom but w/kohler walk-in bath, same location as the existing tub but will need power run to it for the jets.Details
unit 23d: replace hall bathroom but w/kohler walk-in bath, same location as the existing tub but will need power run to it for the jets. | $31,000 |
| Jul 25, 2022 | Completed final sign-off Aug 2022 | 336 Campbell Av | in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s). | $14,000 |
| Jun 24, 2022 | Completed final sign-off Aug 2022 | 336 Campbell Av | in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s). | $14,000 |
| Oct 30, 2019 | Completed final sign-off Jan 2020 | 436 Capp St | replace total of 13 windows, 1 patio door nail finish 1 bath window nail finish, raise sill 18" for smaller window same header same location, not facing st , u+/- 0.32Details
replace total of 13 windows, 1 patio door nail finish 1 bath window nail finish, raise sill 18" for smaller window same header same location, not facing st , u+/- 0.32 | $15,535 |
| Jan 25, 2019 | Never finaled issued Jan 2019, no final | 25 Morningside Dr | install 1 vinyl bathroom window, same size, same location, no change to opening. not visible to street. install 1 clad window in living room not visible to street, viny outside, wood inside, same size same location. no change to opening.Details
install 1 vinyl bathroom window, same size, same location, no change to opening. not visible to street. install 1 clad window in living room not visible to street, viny outside, wood inside, same size same location. no change to opening. | $5,325 |
| Jun 16, 2017 | Never finaled issued Jun 2017, no final | 461 34th Av | replace 2 bathroom windows in retro/block installation, like-for-like w/vinyl frame, not visible from street. u factor 0.32 maxDetails
replace 2 bathroom windows in retro/block installation, like-for-like w/vinyl frame, not visible from street. u factor 0.32 max | $2,258 |
| Jan 21, 2010 | Completed final sign-off Jan 2010 | 2134 Lawton St | retrofit bedroom, kitchen & bathroom windows,total 9, windows not visible from street.Details
retrofit bedroom, kitchen & bathroom windows,total 9, windows not visible from street. | $8,526 |