Back to bathroom remodel contractors
American Technologies Inc
- Based in
- Hayward
- On San Francisco permits
- Oct 2000 to May 2021
- Last 24 months
- 0 permits filed
199 permits since 2000: 156 completed, 20 never finaled, 23 expired or cancelled.
Of the 20 never-finaled permits, 2 are 5 to 10 years old, 18 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
28 bathroom remodel permits: 24 completed, 1 never finaled, 3 expired or cancelled. Typically 0 days from filing to permit and 136 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 5, 2021 | Completed final sign-off Feb 2021 | 3751 Geary Bl | water damage repair. restaurant install drywalls (~250 sf). upstairs unit #1 bathroom install insulation (~50 sf). drywall (~200 sf) on 4' high walls & install tile around bathtub & 4' walls as needed.Details
water damage repair. restaurant install drywalls (~250 sf). upstairs unit #1 bathroom install insulation (~50 sf). drywall (~200 sf) on 4' high walls & install tile around bathtub & 4' walls as needed. | $15,000 |
| Feb 18, 2020 | Completed final sign-off Mar 2020 | 725 Florida St | install insulation: drywall in living room, bedrooms & bathrooms, as needed due to water damange on upstairs unit bathroom.Details
install insulation: drywall in living room, bedrooms & bathrooms, as needed due to water damange on upstairs unit bathroom. | $2,000 |
| Aug 27, 2019 | Completed final sign-off Feb 2020 | 1707 38th Av | drywall & tiles in 2 bathrooms (garage/bedroom) du to water damage, remove/replace bathtub & exhaust fan, replace insulationDetails
drywall & tiles in 2 bathrooms (garage/bedroom) du to water damage, remove/replace bathtub & exhaust fan, replace insulation | $20,000 |
| Nov 14, 2018 | Completed final sign-off Jan 2019 | 120 Upper Tr | replace insulation; installed drywall on ceilingand one walls in living room 559 sq ft, upstairs bathroom wall only approx 16 sqft. due to wter damage. replace floor tile in bathroom.Details
replace insulation; installed drywall on ceilingand one walls in living room 559 sq ft, upstairs bathroom wall only approx 16 sqft. due to wter damage. replace floor tile in bathroom. | $8,000 |
| Sep 18, 2018 | Completed final sign-off Mar 2019 | 380 10th St | patch drywall & install insulation in the bathroom wall & living area walls & also painting. n/a for maher.Details
patch drywall & install insulation in the bathroom wall & living area walls & also painting. n/a for maher. | $3,000 |
| Sep 18, 2018 | Completed final sign-off May 2019 | 380 10th St | install insulation & drywall on walls & ceiling as needed, install new kitchen cabinets & paint. re-install toilet & sink in bathrooms & kitchen. n/a for maher.Details
install insulation & drywall on walls & ceiling as needed, install new kitchen cabinets & paint. re-install toilet & sink in bathrooms & kitchen. n/a for maher. | $35,000 |
| Aug 23, 2018 | Completed final sign-off Jul 2019 | 154 Yukon St | water damage on 154 only. repair in kitchen, entry, living & dining rooms, upstairs bathroom, insulation, drywalls & some plumbing and electrical work. kitchen cabinets, replace as in kind. only replace damaged drywall as needed with 5/8" type x. kitchen remodel, 9'x7'Details
water damage on 154 only. repair in kitchen, entry, living & dining rooms, upstairs bathroom, insulation, drywalls & some plumbing and electrical work. kitchen cabinets, replace as in kind. only replace damaged drywall as needed with 5/8" type x. kitchen remodel, 9'x7' | $15,000 |
| Feb 14, 2018 | Completed final sign-off Sep 2019 | 35 San Juan Av | fire/smoke damage repair. work includes, windows (like for like), drywall, ele, insulation, plm, cabinets, countertops, ada upgrades such as ramp to front door, hand rail, bathrooms, hvac including ductwork, roofing (1 sq patch) maher naDetails
fire/smoke damage repair. work includes, windows (like for like), drywall, ele, insulation, plm, cabinets, countertops, ada upgrades such as ramp to front door, hand rail, bathrooms, hvac including ductwork, roofing (1 sq patch) maher na | $145,000 |
| Feb 6, 2018 | Completed final sign-off Sep 2018 | 1231 Sunnydale Av | water damage repair. drywall on ceiling in the living room, hall bathroom walk & ceiling. upstair drywalls on walls only, bathroom, laundry, bedrooms and closet. install shower pan in the master bathroom. replace as in kindDetails
water damage repair. drywall on ceiling in the living room, hall bathroom walk & ceiling. upstair drywalls on walls only, bathroom, laundry, bedrooms and closet. install shower pan in the master bathroom. replace as in kind | $9,500 |
| Dec 5, 2017 | Completed final sign-off May 2018 | 1959 28th Av | water damages in bathroom. replace insulation, drywalls, walls, & flooring tiles. also replace shower and tub valves. repair in kind.Details
water damages in bathroom. replace insulation, drywalls, walls, & flooring tiles. also replace shower and tub valves. repair in kind. | $10,000 |
| Jan 12, 2017 | Completed final sign-off Mar 2017 | 2282 Bryant St | install hardi backer to tub surround where water damaged was remvoed, tile tub surround, reinstall venity and shower valve trimonly. (work within exisitng bathroom).Details
install hardi backer to tub surround where water damaged was remvoed, tile tub surround, reinstall venity and shower valve trimonly. (work within exisitng bathroom). | $5,000 |
| Apr 7, 2016 | Never finaled issued Apr 2016, no final | 1470 32nd Av | repair water damaged drywall in bathroom. install tile where damaged drywall was removed, reset light fixtures and plumbing fixtures.Details
repair water damaged drywall in bathroom. install tile where damaged drywall was removed, reset light fixtures and plumbing fixtures. | $7,000 |
| Dec 18, 2015 | Completed final sign-off Jun 2016 | 85 Paradise Av | build bathroom in basement per plans to inside framing. mechanical, plumbing, electrical. drywall and finish material.Details
build bathroom in basement per plans to inside framing. mechanical, plumbing, electrical. drywall and finish material. | $20,000 |
| May 12, 2015 | Completed final sign-off Oct 2015 | 756 Mission St | install 5/8 dry wall in both bathrooms basement due to water damage. install tile and partitions. install toilet and sinks in existing locations reinstall all grab bars and paper towel holders. reset existing electrical. repair in kind.Details
install 5/8 dry wall in both bathrooms basement due to water damage. install tile and partitions. install toilet and sinks in existing locations reinstall all grab bars and paper towel holders. reset existing electrical. repair in kind. | $15,000 |
| Mar 11, 2015 | Completed final sign-off Jul 2015 | 900 Bush St | unit 407: drywall in hallway and two bathroom, reset cabinets and toilet, reset light fixtures, approx 100 sf of 1/2 inch sheetrock.Details
unit 407: drywall in hallway and two bathroom, reset cabinets and toilet, reset light fixtures, approx 100 sf of 1/2 inch sheetrock. | $1,500 |
| Feb 17, 2015 | Expired or cancelled cancelled Jan 2026 | 691 Ofarrell St | revision t0 2014-9205119 fpr imots 102, 205,305,405 to include structural change and kitchen configuration and bath configurationDetails
revision t0 2014-9205119 fpr imots 102, 205,305,405 to include structural change and kitchen configuration and bath configuration | $50,000 |
| Oct 6, 2014 | Completed final sign-off Nov 2014 | 301 Main St | unit b23f - repair water damaged sheetrock; install new tile in bathroom floor, shower and tub. pour new shower pan; reinstall vanity, trim and point unit; re-install light fixtures all like in kind. to comply with cec150.0(k)5; maher n/aDetails
unit b23f - repair water damaged sheetrock; install new tile in bathroom floor, shower and tub. pour new shower pan; reinstall vanity, trim and point unit; re-install light fixtures all like in kind. to comply with cec150.0(k)5; maher n/a | $7,000 |
| Apr 2, 2014 | Completed final sign-off May 2014 | 50 Cutler Av | #105. install drywall in living room, hall, bathroom, refinish wood floors, reset light fixtures, paint to match existing. due to water damage total area of drywall is 200 sf. #201. remove kitchen cabinets and install new. install new vinyl floor. paint walls and base to match existing.Details
#105. install drywall in living room, hall, bathroom, refinish wood floors, reset light fixtures, paint to match existing. due to water damage total area of drywall is 200 sf. #201. remove kitchen cabinets and install new. install new vinyl floor. paint walls and base to match existing. | $6,500 |
| Oct 18, 2013 | Completed final sign-off Dec 2013 | 197 18th Av | replace front window with fiberglass wood clad windows.minor interior repairs. remodel bath, remove knob & tube wiring from bath and replace with new wire to code, insulate exterior wall, install new drywall 120 sq.ft., install 3/4" sub floor to bring tile upto hall level, install new tile on floorDetails
replace front window with fiberglass wood clad windows.minor interior repairs. remodel bath, remove knob & tube wiring from bath and replace with new wire to code, insulate exterior wall, install new drywall 120 sq.ft., install 3/4" sub floor to bring tile upto hall level, install new tile on floor | $4,500 |
| Oct 17, 2013 | Completed final sign-off Jan 2014 | 956 Junipero Serra Bl | 2nd fl bath. install new drywall sheathing 50 sf shower pan, tile, reset toilet and sink. 1st fl new carpet. no new wall/relocation. garage level new drywall sheathingDetails
2nd fl bath. install new drywall sheathing 50 sf shower pan, tile, reset toilet and sink. 1st fl new carpet. no new wall/relocation. garage level new drywall sheathing | $19,000 |
| Feb 16, 2012 | Completed final sign-off Sep 2012 | 1529 48th Av | fire damage repair, minor framing repair, rewire, drywall and finishes. window replacement and hvac repair. same size, no framing changes. kitchen & bath remodel.Details
fire damage repair, minor framing repair, rewire, drywall and finishes. window replacement and hvac repair. same size, no framing changes. kitchen & bath remodel. | $40,000 |
| Aug 24, 2011 | Completed final sign-off Mar 2012 | 3208 Mission St | comply with complaint #201117670 - fire damage. fire & water damage restoration including electrical, plumbing & heating, roof/roofing, kitchens & bathrooms per plan.Details
comply with complaint #201117670 - fire damage. fire & water damage restoration including electrical, plumbing & heating, roof/roofing, kitchens & bathrooms per plan. | $480,000 |
| Jun 2, 2011 | Completed final sign-off Oct 2012 | 343 Panorama Dr | repairs due to fire and water damage. legalize playroom and bath at garage level.Details
repairs due to fire and water damage. legalize playroom and bath at garage level. | $50,000 |
| May 20, 2011 | Completed final sign-off Sep 2011 | 40 Worth St | install new drywall in living room ceiling, 250 s.f. add 5 can lights in living room ceiling, install drywall in upstairs bath walls 200 s.f. roughly, re-set vanity and toilet in upstairs bath.Details
install new drywall in living room ceiling, 250 s.f. add 5 can lights in living room ceiling, install drywall in upstairs bath walls 200 s.f. roughly, re-set vanity and toilet in upstairs bath. | $1,200 |
| Jan 7, 2011 | Completed final sign-off Mar 2011 | 65 Amethyst Wy | water damage cause drywall damage to portion of kitchen, downstair bath, hallway and portion of two bedrooms; replace existing drywall with new to match existing. no wall relocation. also replace bathroom fan and vanity light.Details
water damage cause drywall damage to portion of kitchen, downstair bath, hallway and portion of two bedrooms; replace existing drywall with new to match existing. no wall relocation. also replace bathroom fan and vanity light. | $1,500 |
| Dec 15, 2009 | Completed final sign-off Apr 2010 | 2734 38th Av | restoration of sheetrock in bathroom secondary to h20 (water) damage, insurance restoration, no new walls, no structural. shower valve change out, add 2 smoke lights & gfci recuit/title 24 standards. no structural changes=500 sq ft (5/8 gyp board)Details
restoration of sheetrock in bathroom secondary to h20 (water) damage, insurance restoration, no new walls, no structural. shower valve change out, add 2 smoke lights & gfci recuit/title 24 standards. no structural changes=500 sq ft (5/8 gyp board) | $5,997 |
| Dec 3, 2007 | Expired or cancelled expired Aug 2009 | 109 Lake Merced Hill So Bl | replace 5/8" drywall in bedroom, closet and bathroom of apartment approx: 2' high x 120' long. replace toilet, tub + sink, texture replaced drywall + paint (water damage from inside leak).Details
replace 5/8" drywall in bedroom, closet and bathroom of apartment approx: 2' high x 120' long. replace toilet, tub + sink, texture replaced drywall + paint (water damage from inside leak). | $9,650 |
| Mar 31, 2005 | Expired or cancelled expired Aug 2011 | 2165 Larkin St | #201,202,301,302 remove/replace 100% sheetrock,#107-sheetrock remove/replace hall & bathroom,Details
#201,202,301,302 remove/replace 100% sheetrock,#107-sheetrock remove/replace hall & bathroom, | $250,000 |