Block 2449, lot 037
50 Cutler Ave
- City’s use
- Multi-Family Residential
- Built
- 1927
- Stories
- 2
- Units
- 12
- Rooms
- 12 bathrooms
- Building
- 8,306 sq ft
- Lot
- 8,925 sq ft
- Zoning
- RH2
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
11 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 6, 2021 | Completed final sign-off Jun 2022 | 50 Cutler Av | Commercial Fire Protection Inc | install low frequency sounders to meet 75db at the pillow per sffc section 1103.7.6.1 and replace the existing fire alarm control panel.Details
install low frequency sounders to meet 75db at the pillow per sffc section 1103.7.6.1 and replace the existing fire alarm control panel. | $36,000 |
| Apr 17, 2019 | Never finaled issued Apr 2019, no final | 50 Cutler Av | street spaceDetails
street space | ||
| Feb 29, 2016 | Completed final sign-off May 2016 | 50 Cutler Av | Everest Waterproofing & Restoration Inc. | to comply with nov 201578471: repair areas of falling concrete and loose masonary on west and south facade. waterproof and paint bldg after repairDetails
to comply with nov 201578471: repair areas of falling concrete and loose masonary on west and south facade. waterproof and paint bldg after repair | $78,000 |
| Feb 17, 2015 | Expired or cancelled expired Feb 2017 | 50 Cutler Av | Standardconstr/Standardroof | r e r o o f i n g --layer #30 asphalt saturated felt underlayment. install shingles as per manufactures specifications. this roofing has a class a fire rating. all roofs new or replacment with slope >2:12 pitch and product unit weight less tah 5lb/2ft. replace in kindDetails
r e r o o f i n g --layer #30 asphalt saturated felt underlayment. install shingles as per manufactures specifications. this roofing has a class a fire rating. all roofs new or replacment with slope >2:12 pitch and product unit weight less tah 5lb/2ft. replace in kind | $32,000 |
| Aug 21, 2014 | Expired or cancelled expired Feb 2017 | 50 Cutler Av | The Window Specialist | retrofit 1 double hung vinyl window in kitchen, u factor < .32 at the same opening & style. not visible from street & meets title 24Details
retrofit 1 double hung vinyl window in kitchen, u factor < .32 at the same opening & style. not visible from street & meets title 24 | $500 |
| Apr 2, 2014 | Completed final sign-off May 2014 | 50 Cutler Av | American Technologies Inc | #105. install drywall in living room, hall, bathroom, refinish wood floors, reset light fixtures, paint to match existing. due to water damage total area of drywall is 200 sf. #201. remove kitchen cabinets and install new. install new vinyl floor. paint walls and base to match existing.Details
#105. install drywall in living room, hall, bathroom, refinish wood floors, reset light fixtures, paint to match existing. due to water damage total area of drywall is 200 sf. #201. remove kitchen cabinets and install new. install new vinyl floor. paint walls and base to match existing. | $6,500 |
| Sep 22, 2011 | Never finaled issued Sep 2011, no final | 50 Cutler Av | Make Ready Maintenance Inc | #103 - remodel kitchen to remove & replace cabinets. no structural work & no walls relcoation. no new lighting.Details
#103 - remodel kitchen to remove & replace cabinets. no structural work & no walls relcoation. no new lighting. | $13,000 |
| Jan 10, 2011 | Completed final sign-off Apr 2011 | 50 Cutler Av | Make Ready Maintenance Inc | unit #202 -install g.f.c.i./subpanel, remove & replace kitchen cabinets, no structural work, no new lighting.Details
unit #202 -install g.f.c.i./subpanel, remove & replace kitchen cabinets, no structural work, no new lighting. | $18,000 |
| Dec 1, 2010 | Completed final sign-off Jan 2011 | 50 Cutler Av | Make Ready Maintenance Inc | install gfci & sub-panel, remoce & replace kitchen cabinets, no structural work, no new lighting in unit #203Details
install gfci & sub-panel, remoce & replace kitchen cabinets, no structural work, no new lighting in unit #203 | $18,000 |
| Oct 28, 2009 | Completed final sign-off Jan 2010 | 50 Cutler Av | On-Site Maintenance | kitchen remodel, cabinets, counter top, replace angle strip, sink, faucet, p-trap,supply lines, new gas loop. bathroom remodel, replace sink, faucet, faucet, p-trap, supply lines, new low flow toilet. replace light fixtures. no window,no door work on this permit.Details
kitchen remodel, cabinets, counter top, replace angle strip, sink, faucet, p-trap,supply lines, new gas loop. bathroom remodel, replace sink, faucet, faucet, p-trap, supply lines, new low flow toilet. replace light fixtures. no window,no door work on this permit. | $15,500 |
| Sep 30, 2005 | Never finaled issued Sep 2005, no final | 50 Cutler Av | S'top Home Service Roofing Co. Inc. | reroofingDetails
reroofing | $6,780 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Make Ready Maintenance Inc (3), American Technologies Inc, Commercial Fire Protection Inc, Everest Waterproofing & Restoration Inc., On-Site Maintenance, S'top Home Service Roofing Co. Inc., Standardconstr/Standardroof, The Window Specialist
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.