American Design & Build Inc
- Based in
- Rio Nido
- On San Francisco permits
- Mar 2006 to Feb 2021
- Last 24 months
- 0 permits filed
34 permits since 2000: 29 completed, 2 never finaled, 3 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
2 deck permits: 1 completed, 1 expired or cancelled. Typically 158 days from filing to permit and 92 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 30, 2015 | Expired or cancelled expired Mar 2019 | 228 Clipper St | enclose porch- add deck and stairs- remove walls partial kitchen remodel.Details
enclose porch- add deck and stairs- remove walls partial kitchen remodel. | $39,800 |
| May 8, 2012 | Completed final sign-off Aug 2012 | 594 29th St | remove and replace stair railing. change 2 windows and 1 door. convert flat roof to deck 10x11. add 5 internal steps, add glass railing around deckDetails
remove and replace stair railing. change 2 windows and 1 door. convert flat roof to deck 10x11. add 5 internal steps, add glass railing around deck | $22,600 |