Back to bathroom remodel contractors
American Design & Build Inc
- Based in
- Rio Nido
- On San Francisco permits
- Mar 2006 to Feb 2021
- Last 24 months
- 0 permits filed
34 permits since 2000: 29 completed, 2 never finaled, 3 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
13 bathroom remodel permits: 13 completed. Typically 1 days from filing to permit and 134 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 2, 2021 | Completed final sign-off Jul 2021 | 3030 Broderick St | unit #1 & 4 - remodel kitchen move to opposite wall, replace toilet and vanity in bathroom, re-tile shower. relocate kitchen and add a study rm. install 2 windows inserts like for like not visible from st. paintDetails
unit #1 & 4 - remodel kitchen move to opposite wall, replace toilet and vanity in bathroom, re-tile shower. relocate kitchen and add a study rm. install 2 windows inserts like for like not visible from st. paint | $64,000 |
| Feb 2, 2021 | Completed final sign-off Jul 2021 | 3030 Broderick St | unit #6 - remodel kitchen move to opposite wall, replace toilet and vanity in bathroom, re-tile shower. relocate kitchen and add a study rm. install 2 windows inserts like for like not visible from st.Details
unit #6 - remodel kitchen move to opposite wall, replace toilet and vanity in bathroom, re-tile shower. relocate kitchen and add a study rm. install 2 windows inserts like for like not visible from st. | $34,000 |
| Aug 11, 2020 | Completed final sign-off Dec 2020 | 1260 17th Av | apt 1 & 4: each unit: install kitchen new cabinets and replace bathroom fixtures (tub,sinks and tile bathrooms). kitchen are (10.3x10.3) & bathroom are (5x7).Details
apt 1 & 4: each unit: install kitchen new cabinets and replace bathroom fixtures (tub,sinks and tile bathrooms). kitchen are (10.3x10.3) & bathroom are (5x7). | $47,500 |
| Jan 21, 2020 | Completed final sign-off Jun 2020 | 3030 Broderick St | unit #3: kitchen, 8'x10' and bathroom, 3'x5' remodel in kind, w/ (3) windows replacement in kind. retile bath, new sink, toilet, lights. new shower pan. kitchen cabinets, lights. windows in light well not visible from street. replace in kindDetails
unit #3: kitchen, 8'x10' and bathroom, 3'x5' remodel in kind, w/ (3) windows replacement in kind. retile bath, new sink, toilet, lights. new shower pan. kitchen cabinets, lights. windows in light well not visible from street. replace in kind | $18,900 |
| Nov 18, 2019 | Completed final sign-off Oct 2020 | 1609 Baker St | bathroom remodel like for like. convert tub to shower walk-in. add 3 new toilets-sinks-vanitiesDetails
bathroom remodel like for like. convert tub to shower walk-in. add 3 new toilets-sinks-vanities | $5,000 |
| Jul 29, 2019 | Completed final sign-off Sep 2019 | 3030 Broderick St | unit 1: remodel bathroom: retile, new sink, new lights, shower pan; replace 1 bathroom window in lightwell, insert only and not visible from street.Details
unit 1: remodel bathroom: retile, new sink, new lights, shower pan; replace 1 bathroom window in lightwell, insert only and not visible from street. | $8,780 |
| Jan 16, 2018 | Completed final sign-off Mar 2019 | 1925 Jackson St | remodel bathroom like for like. install new handrail. expand or merge 2 master bedroom closets.Details
remodel bathroom like for like. install new handrail. expand or merge 2 master bedroom closets. | $9,600 |
| Jul 25, 2016 | Completed final sign-off Dec 2016 | 594 29th St | remodel one bathroom - replace one skylight same size & locationDetails
remodel one bathroom - replace one skylight same size & location | $8,935 |
| Jun 13, 2013 | Completed final sign-off Nov 2013 | 122 Avila St | remodel bathroom, kitchen, enclose stairs. convert family room into master bedroom. new window inserts & 1 skylight. add fascia trim, false roof facadeDetails
remodel bathroom, kitchen, enclose stairs. convert family room into master bedroom. new window inserts & 1 skylight. add fascia trim, false roof facade | $46,000 |
| Aug 9, 2012 | Completed final sign-off Dec 2012 | 165 Clipper St | remodel 2 baths 1/2 bath to full, kitchen, bedroom, laundry. upgrade electrical to rear utility room, 1/2 bath to full.Details
remodel 2 baths 1/2 bath to full, kitchen, bedroom, laundry. upgrade electrical to rear utility room, 1/2 bath to full. | $23,686 |
| Jul 17, 2012 | Completed final sign-off Sep 2012 | 3 Helen St | remodel bathroom: remove (e) vanity, sink, faucets, bathtub, toilet, ceiling lights, vent fan. install new vanity cabinety, recessed sink, wall mounted faucet, toilet, bathtub, replace door with pocket door. new wall cabinets, tile floors and bathtub surround.Details
remodel bathroom: remove (e) vanity, sink, faucets, bathtub, toilet, ceiling lights, vent fan. install new vanity cabinety, recessed sink, wall mounted faucet, toilet, bathtub, replace door with pocket door. new wall cabinets, tile floors and bathtub surround. | $10,963 |
| Mar 11, 2009 | Completed final sign-off Jun 2009 | 1929 Jackson St | remodel 3 bathrooms. add some electrical. add skylightDetails
remodel 3 bathrooms. add some electrical. add skylight | $56,300 |
| Aug 25, 2008 | Completed final sign-off Mar 2009 | 2050 Mcallister St | ground floor remodel: relocate laundry area, add full bath. relocate existing side door, stair, and landing.Details
ground floor remodel: relocate laundry area, add full bath. relocate existing side door, stair, and landing. | $37,862 |