Back to bathroom remodel contractors
American Building Development
- Based in
- North Highlands
- On San Francisco permits
- Mar 2024 to Jul 2026
- Last 24 months
- 5 permits filed
6 permits since 2000: 5 completed, 1 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
2 bathroom remodel permits: 2 completed. Typically 0 days from filing to permit and 92 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 5, 2025 | Completed final sign-off Jul 2025 | 50 Reardon Rd | #211: replace bathroom window 36x30. replace bathtub, shower walls, sheetrock, and quarts panels. replace shower valve. window is not facing the street. u factor <0.30Details
#211: replace bathroom window 36x30. replace bathtub, shower walls, sheetrock, and quarts panels. replace shower valve. window is not facing the street. u factor <0.30 | $5,000 |
| Apr 8, 2025 | Completed final sign-off Jul 2025 | 8 Reardon Rd | unit 221: window replacement and frame modification in bathroom. existing window size is 36x30. proposed window size is 36x16. non street facing.Details
unit 221: window replacement and frame modification in bathroom. existing window size is 36x30. proposed window size is 36x16. non street facing. | $2,000 |