American Builders
- Based in
- Pacifica
- On San Francisco permits
- Dec 2014 to Sep 2026
- Last 24 months
- 19 permits filed
63 permits since 2000: 47 completed, 9 in progress, 5 never finaled, 2 expired or cancelled.
Of the 5 never-finaled permits, 2 are 3 to 5 years old, 2 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
7 stairs permits: 6 completed, 1 in progress. Typically 28 days from filing to permit and 385 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 9, 2025 | Completed final sign-off Mar 2026 | 1039 Portola Dr | rebuild stairs in kind bpa#2025-0923-5942Details
rebuild stairs in kind bpa#2025-0923-5942 | $25,000 |
| Sep 23, 2025 | Completed final sign-off Mar 2026 | 1039 Portola Dr | repair front stair under 50%Details
repair front stair under 50% | $15,000 |
| Jun 25, 2024 | In progress issued Jul 2024 | 910 Rockdale Dr | rebuild stairs in kind at front. voluntary structural strengthening to crawl space, basement, garage. work will not affect public right awayDetails
rebuild stairs in kind at front. voluntary structural strengthening to crawl space, basement, garage. work will not affect public right away | $35,000 |
| Nov 21, 2023 | Completed final sign-off Oct 2024 | 74 Madrone Av | demo & replace lath and plaster due to cracked ceiling and knob & tube at ceiling (bedroom and living rm), install anchor bolts w/ sq washers at al explosed areas, reinforce and reapir dryrott unser stairs, drwall patches for udgraded wlectrical workers (all work is inside)Details
demo & replace lath and plaster due to cracked ceiling and knob & tube at ceiling (bedroom and living rm), install anchor bolts w/ sq washers at al explosed areas, reinforce and reapir dryrott unser stairs, drwall patches for udgraded wlectrical workers (all work is inside) | $35,000 |
| Sep 26, 2020 | Completed final sign-off May 2022 | 100 Robinson Dr | remodel kitchen. reconfigure interior stairs. new deck at rear.Details
remodel kitchen. reconfigure interior stairs. new deck at rear. | $30,000 |
| Nov 6, 2015 | Completed final sign-off Apr 2017 | 938 Hampshire St | repair front stairs in kind. comply with nov 201553631Details
repair front stairs in kind. comply with nov 201553631 | $8,000 |
| Jul 14, 2015 | Completed final sign-off Dec 2017 | 938 Hampshire St | to comply with nov#h9403645, 201520932, 200989380, 201538971, 201538921, 201411822, 201520761, 201410532, 201538991, 201401822. reconstruct rear deck & stair per 9515826. eliminate roof structure over (e) roof built without benefit of a permit application.Details
to comply with nov#h9403645, 201520932, 200989380, 201538971, 201538921, 201411822, 201520761, 201410532, 201538991, 201401822. reconstruct rear deck & stair per 9515826. eliminate roof structure over (e) roof built without benefit of a permit application. | $300,000 |