Back to kitchen remodel contractors
Amador's Drywall
- Based in
- South San Francisco
- On San Francisco permits
- Oct 2024 to Oct 2026
- Last 24 months
- 12 permits filed
12 permits since 2000: 9 completed, 2 in progress, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
3 kitchen remodel permits: 3 completed. Typically 1 days from filing to permit and 100 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 23, 2026 | Completed final sign-off Aug 2026 | 220 Westgate Dr | existing door located in the kitchen and in-fill and close out. demolish existing window at the dining room and relcoated a door to provide egress to that rear side yard.Details
existing door located in the kitchen and in-fill and close out. demolish existing window at the dining room and relcoated a door to provide egress to that rear side yard. | $20,000 |
| Mar 6, 2026 | Completed final sign-off Jun 2026 | 3464 17th St | drywall installation single layer of drywal or ceiling throughout, some walls, patch over kitchen cabinets & laundry room 1 wall (double layer), mu, tape, level 4 finish cover & protect clean debrisDetails
drywall installation single layer of drywal or ceiling throughout, some walls, patch over kitchen cabinets & laundry room 1 wall (double layer), mu, tape, level 4 finish cover & protect clean debris | $47,174 |
| Jun 23, 2025 | Completed final sign-off Oct 2025 | 143 Dolores St | kitchen remodel 10x10. demo exisitng cabinets and new cabinet installation. bathroom remodel 7x7. shower pan demolition, new pan installation. tile, new fixtures, medicine cabinet, toilet, sink, and cabinets. shower valve replacement. paint 540 sq ft throughout apartment. paint door inside apt.Details
kitchen remodel 10x10. demo exisitng cabinets and new cabinet installation. bathroom remodel 7x7. shower pan demolition, new pan installation. tile, new fixtures, medicine cabinet, toilet, sink, and cabinets. shower valve replacement. paint 540 sq ft throughout apartment. paint door inside apt. | $19,000 |