Back to bathroom remodel contractors
Am Construction Inc
- Based in
- Walnut Creek
- On San Francisco permits
- Apr 2010 to Jun 2025
- Last 24 months
- 4 permits filed
31 permits since 2000: 27 completed, 1 in progress, 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 1 is 3 to 5 years old, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
15 bathroom remodel permits: 12 completed, 2 never finaled, 1 expired or cancelled. Typically 5 days from filing to permit and 240 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 25, 2025 | Completed final sign-off Jun 2025 | 855 Rhode Island St | kitchen: r/r (e) cabinetry.demo pantry.bathroom: vanity,mirror.light fixtures and tilet to be replaced.laundry room relocation including ventless dryer.electrical instllation of gfci receptablce, switches, vacancy sensor and light fixtures.Details
kitchen: r/r (e) cabinetry.demo pantry.bathroom: vanity,mirror.light fixtures and tilet to be replaced.laundry room relocation including ventless dryer.electrical instllation of gfci receptablce, switches, vacancy sensor and light fixtures. | $36,500 |
| Feb 11, 2025 | Completed final sign-off Oct 2025 | 92 San Pablo Av | like for like bathroom remodel including: new shower pan, toilet installation, pedestal sink and new flooring. outlets to be updated to gfci and sensor switch to be included, no wall demolition or construction, no change in plumbing fixture count.Details
like for like bathroom remodel including: new shower pan, toilet installation, pedestal sink and new flooring. outlets to be updated to gfci and sensor switch to be included, no wall demolition or construction, no change in plumbing fixture count. | $12,500 |
| Apr 2, 2024 | Completed final sign-off Jun 2024 | 601 Van Ness Av | like for like kitchen and bathroom. bathroom includes: (1) bathtub, (1) vanity, and (1) toilet. kitchen includes: sink, (4) new lights. outlets upgraded throughout. no moving wallsDetails
like for like kitchen and bathroom. bathroom includes: (1) bathtub, (1) vanity, and (1) toilet. kitchen includes: sink, (4) new lights. outlets upgraded throughout. no moving walls | $40,000 |
| Feb 21, 2024 | Completed final sign-off Aug 2025 | 440 Missouri St | exisiting bathroom demolished, new bathroom fabricatedd to be replace it. kitchen remodel, including supply relocation. new appliance installation.Details
exisiting bathroom demolished, new bathroom fabricatedd to be replace it. kitchen remodel, including supply relocation. new appliance installation. | $85,000 |
| Aug 9, 2023 | Completed final sign-off Jan 2025 | 2052 Greenwich St | creating new work room at level 1, door and window at rear facade, new lighting and power at work room. voluntary seismic retrofit. new bathroom at level 1, replace garage door. replace gas furnaces for both units.Details
creating new work room at level 1, door and window at rear facade, new lighting and power at work room. voluntary seismic retrofit. new bathroom at level 1, replace garage door. replace gas furnaces for both units. | $58,000 |
| Jun 7, 2023 | Completed final sign-off Jul 2024 | 849 Dolores St | conversion of addition to existing 527 sf family room & bath to become a 550 sf adu unit per oridinance 95-17.Details
conversion of addition to existing 527 sf family room & bath to become a 550 sf adu unit per oridinance 95-17. | $70,000 |
| Feb 28, 2023 | Never finaled issued Jul 2023, no final | 415 Tehama St | all 6 units: interior alterations, demo existing lath and plaster. replace with drywall sheetboard, partial demolition of interior partitions, new interior partitions. bathroom and kitchen renovations, window replacement in-kind. front windows facing street to be wood w/integrated ogee lugsDetails
all 6 units: interior alterations, demo existing lath and plaster. replace with drywall sheetboard, partial demolition of interior partitions, new interior partitions. bathroom and kitchen renovations, window replacement in-kind. front windows facing street to be wood w/integrated ogee lugs | $203,000 |
| Jun 30, 2021 | Completed final sign-off Dec 2021 | 270 San Leandro Wy | four bathrooms, in kind remodel. all cabinerty hardware flooring anad fixtures to be replaced with new. all electrical and plumbing locations to remain as is.Details
four bathrooms, in kind remodel. all cabinerty hardware flooring anad fixtures to be replaced with new. all electrical and plumbing locations to remain as is. | $6,000 |
| Apr 17, 2019 | Never finaled issued Apr 2019, no final | 418 Corbett Av | demo all tile in bathroom/replace all areas affected by repair leak from roof. replace window frame- from dry rot. all work in-kind.Details
demo all tile in bathroom/replace all areas affected by repair leak from roof. replace window frame- from dry rot. all work in-kind. | $4,000 |
| Mar 26, 2019 | Completed final sign-off Aug 2020 | 51 Seward St | interior remodel - reconfigure bathrooms, relocate laundry, remodel kitchen, provide new rear facing windows, skylight, raised deck 3 feet above grade, new fenceDetails
interior remodel - reconfigure bathrooms, relocate laundry, remodel kitchen, provide new rear facing windows, skylight, raised deck 3 feet above grade, new fence | $60,000 |
| Jul 20, 2018 | Completed final sign-off Oct 2018 | 1821 15th St | #16 -interior remodel to upper floor 4th floor master bathroom.Details
#16 -interior remodel to upper floor 4th floor master bathroom. | $10,000 |
| Aug 22, 2017 | Completed final sign-off Jan 2018 | 1000 Steiner St | interior renovation 2nd fl unit 202. no struc, kitchen remodel new cab,cntr top, shift wall btwn mstr bath,guest bath, remodel baths. install hardwood flr, replace tiles at (e) fire place, install hearth, relocate door at guest rm hallway closetDetails
interior renovation 2nd fl unit 202. no struc, kitchen remodel new cab,cntr top, shift wall btwn mstr bath,guest bath, remodel baths. install hardwood flr, replace tiles at (e) fire place, install hearth, relocate door at guest rm hallway closet | $20,000 |
| Feb 8, 2017 | Expired or cancelled expired Mar 2023 | 30 Randolph St | comply w/nov #201495481 - new in-law unit conversion of 437 sq ft on ground floor/basement including 1 bedroom, 1 bathroom, 1 kitchen. removal & demolition of existing walls. new walls as per plans. sprinkler on deferred submittal.Details
comply w/nov #201495481 - new in-law unit conversion of 437 sq ft on ground floor/basement including 1 bedroom, 1 bathroom, 1 kitchen. removal & demolition of existing walls. new walls as per plans. sprinkler on deferred submittal. | $54,500 |
| Aug 26, 2015 | Completed final sign-off Jun 2016 | 1742 La Salle Av | unit 1742: revision to 2009 0721 3063 & 201508214961: relocate kitchen & bathroom, create laundry closet, replace damaged shet rock. remove vanity.Details
unit 1742: revision to 2009 0721 3063 & 201508214961: relocate kitchen & bathroom, create laundry closet, replace damaged shet rock. remove vanity. | $32,000 |
| Apr 6, 2010 | Completed final sign-off Jun 2018 | 175 Mangels Av | alteration to existing single family dwelling, including replace interior stair, remodel kitchen & addition to rear including new bedroom and bathroom and associated title 24. add dormer above stair.Details
alteration to existing single family dwelling, including replace interior stair, remodel kitchen & addition to rear including new bedroom and bathroom and associated title 24. add dormer above stair. | $76,500 |