Back to kitchen remodel contractors
Alvarez Construction & Tile, Inc
- Based in
- San Francisco
- On San Francisco permits
- Oct 2005 to Oct 2026
- Last 24 months
- 16 permits filed
126 permits since 2000: 98 completed, 5 in progress, 17 never finaled, 6 expired or cancelled.
Of the 17 never-finaled permits, 5 are 3 to 5 years old, 4 are 5 to 10 years old, 8 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
41 kitchen remodel permits: 30 completed, 2 in progress, 9 never finaled. Typically 0 days from filing to permit and 86 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 10, 2026 | In progress issued Sep 2026 | 1270 03rd Av | 1/f - remodel unit throughout, new plumbing, new electrical, new kitchen, new bathrooms, create new opening, install new header per drawing. 2/f - remodel unit throughout, new plumbing, new electrical, remodel kitchen + bath. add 2 bathrooms on first floor-unit#1274 & 2nd fl unit#1272 respectivelyDetails
1/f - remodel unit throughout, new plumbing, new electrical, new kitchen, new bathrooms, create new opening, install new header per drawing. 2/f - remodel unit throughout, new plumbing, new electrical, remodel kitchen + bath. add 2 bathrooms on first floor-unit#1274 & 2nd fl unit#1272 respectively | $215,000 |
| Aug 12, 2025 | Completed final sign-off Sep 2025 | 139 Alhambra St | legalization of kitchen remodel at unit 141 alahambra, and window replacement of 20 windows all non street visible for both unit 139 & 141 alahambra st (no plans).Details
legalization of kitchen remodel at unit 141 alahambra, and window replacement of 20 windows all non street visible for both unit 139 & 141 alahambra st (no plans). | $9,500 |
| Aug 5, 2025 | In progress issued Aug 2025 | 2666 Greenwich St | kitchen remodel: create wider opening at kitchen, new electrical and plumbing per drawings.Details
kitchen remodel: create wider opening at kitchen, new electrical and plumbing per drawings. | $80,000 |
| May 13, 2025 | Completed final sign-off Apr 2026 | 1853 Hyde St | units (1855 and 1857) kitchens remodel in kind: upgrade countertops, cabinets, new plumbing, new appliances, new paint, (drywall and insulation as needed)Details
units (1855 and 1857) kitchens remodel in kind: upgrade countertops, cabinets, new plumbing, new appliances, new paint, (drywall and insulation as needed) | $60,000 |
| Feb 10, 2025 | Completed final sign-off Jun 2025 | 3350 Laguna St | unit 101: kitchen remodel - create new opening b/t kitchen and living room. install new electrical and plumbing per plan. install new cabinets, countertops and appliances. master bathroom remodel - install new shower pan, drain, new valve, new toilet, new sink, new tile and new paint.Details
unit 101: kitchen remodel - create new opening b/t kitchen and living room. install new electrical and plumbing per plan. install new cabinets, countertops and appliances. master bathroom remodel - install new shower pan, drain, new valve, new toilet, new sink, new tile and new paint. | $40,000 |
| Aug 10, 2023 | Completed final sign-off Oct 2023 | 2121 Laguna St | #220: upgrade kitchen in kind: upgrade electrical with gfci outlets. install new cabinets, new countertops, new appliances, new sink and faucet.Details
#220: upgrade kitchen in kind: upgrade electrical with gfci outlets. install new cabinets, new countertops, new appliances, new sink and faucet. | $25,000 |
| Aug 10, 2023 | Never finaled issued Aug 2023, no final | 723 43rd Av | remodel kitchen in kind. upgrade electrical with gfci outlet. install new cabnets, new countertops, new appliances, new sink, and new faucet.Details
remodel kitchen in kind. upgrade electrical with gfci outlet. install new cabnets, new countertops, new appliances, new sink, and new faucet. | $25,000 |
| Nov 8, 2022 | Completed final sign-off Jan 2023 | 8 Mirabel Av | remodel one kitchen and one bathroom in-kind. no wall removalDetails
remodel one kitchen and one bathroom in-kind. no wall removal | $20,000 |
| May 31, 2022 | Never finaled issued May 2022, no final | 1620 Lawton St | one kitchen: upgrade 160 sqft kitchen in-kind, no structural, new cabinets, new appliances, new fixtures, new garbage disposal. (3) bathrooms: install new toilet, new shower drain, new shower faucet. all bathrooms in-kind replacement.Details
one kitchen: upgrade 160 sqft kitchen in-kind, no structural, new cabinets, new appliances, new fixtures, new garbage disposal. (3) bathrooms: install new toilet, new shower drain, new shower faucet. all bathrooms in-kind replacement. | $50,000 |
| Apr 1, 2022 | Completed final sign-off May 2022 | 434 19th Av | remodel kitchen in-kind: new electrical & plumbing. instlal new kitchen cabinets, appliances, countertops.Details
remodel kitchen in-kind: new electrical & plumbing. instlal new kitchen cabinets, appliances, countertops. | $25,000 |
| Nov 16, 2021 | Completed final sign-off Feb 2022 | 57 Benton Av | add new bedroom on g/f with new window on the side of property and kitchen remodeling on the main floor.Details
add new bedroom on g/f with new window on the side of property and kitchen remodeling on the main floor. | $40,000 |
| Sep 30, 2021 | Never finaled issued Sep 2021, no final | 2082 Revere Av | upgrade kitchen in kind - new drywall, new cabinets and counters, upgrade electrical and plumbing, new appliances. upgrade bathroom in kind - new bathtub, toilet, sink and new faucet. non structural.Details
upgrade kitchen in kind - new drywall, new cabinets and counters, upgrade electrical and plumbing, new appliances. upgrade bathroom in kind - new bathtub, toilet, sink and new faucet. non structural. | $25,000 |
| Aug 17, 2021 | Completed final sign-off Nov 2021 | 436 19th Av | one kitchen remodel in-kind new electrical & new plumbing. installl new kitchen cabinets, appliances, countertops, (150 sqft. at ktichen) non structural. roof-replace roof-18 square/touchdown. lights per cec 150.0 kDetails
one kitchen remodel in-kind new electrical & new plumbing. installl new kitchen cabinets, appliances, countertops, (150 sqft. at ktichen) non structural. roof-replace roof-18 square/touchdown. lights per cec 150.0 k | $50,000 |
| Jul 26, 2021 | Completed final sign-off Oct 2021 | 249 Gambier St | kitchen remodel in kind-new cabinets, new counters,new appliances,new flooring, new paint, upgrade elect as needed. appox 140 sq ft. bathrm remdel in-kind: new tile, new fixtures, new paint, approx 60 sq.ft. no wall alteration.Details
kitchen remodel in kind-new cabinets, new counters,new appliances,new flooring, new paint, upgrade elect as needed. appox 140 sq ft. bathrm remdel in-kind: new tile, new fixtures, new paint, approx 60 sq.ft. no wall alteration. | $45,000 |
| Apr 28, 2021 | Completed final sign-off Nov 2021 | 853 Page St | kitchen remodel - approx 120 sq ft. install new counters, upgrade laundry hookups. upgrade electrical & plumbing. bath: new tub,new toilet,new sink,new tiles,upgrade electrical.Details
kitchen remodel - approx 120 sq ft. install new counters, upgrade laundry hookups. upgrade electrical & plumbing. bath: new tub,new toilet,new sink,new tiles,upgrade electrical. | $25,000 |
| Feb 18, 2021 | Completed final sign-off Jul 2021 | 331 Octavia St | unit 8: remodel 600 sqft studio- upgrade bathroom plumbing, electrical, new tile, fixtures. upgrade kitchen - new stove, fridge, dishwasherDetails
unit 8: remodel 600 sqft studio- upgrade bathroom plumbing, electrical, new tile, fixtures. upgrade kitchen - new stove, fridge, dishwasher | $15,000 |
| Jan 12, 2021 | Completed final sign-off Mar 2021 | 2501 47th Av | kitchen upgrade cabinets, counter, appliances, bathroom. new bath tub, sink, fixtures, toiletDetails
kitchen upgrade cabinets, counter, appliances, bathroom. new bath tub, sink, fixtures, toilet | $35,000 |
| Nov 18, 2020 | Completed final sign-off Jan 2021 | 653 San Jose Av | kitchen: replace countertops, install new sink & faucet (12'x12'). toilet room: install new toilet & new tile. laundry room: install new washer/dryer hookups. bathroom: install new tub/shower, sink (6'2"x7')Details
kitchen: replace countertops, install new sink & faucet (12'x12'). toilet room: install new toilet & new tile. laundry room: install new washer/dryer hookups. bathroom: install new tub/shower, sink (6'2"x7') | $18,000 |
| Jun 26, 2020 | Completed final sign-off Jan 2021 | 4619 Ulloa St | master bathroom remodel (8ftx5ft)- replace toilet, sink, faucet, shower, shower valve. guest bathroom remodel (7ftx5ft) - toilet, sink sink faucet, bathtub, tub and shower valve. kitchen remodel(9ft x13ft)- replace cabinetry, dishwasher, sink. upgrade non-grounded outlets. all work in kind.Details
master bathroom remodel (8ftx5ft)- replace toilet, sink, faucet, shower, shower valve. guest bathroom remodel (7ftx5ft) - toilet, sink sink faucet, bathtub, tub and shower valve. kitchen remodel(9ft x13ft)- replace cabinetry, dishwasher, sink. upgrade non-grounded outlets. all work in kind. | $25,000 |
| Jun 22, 2020 | Completed final sign-off Nov 2020 | 31 Highland Av | replace kitchen cabinets like for likeDetails
replace kitchen cabinets like for like | $10,000 |
| May 27, 2020 | Completed final sign-off Sep 2020 | 331 Octavia St | unit 12. bathroom and kitchen remodel and electrical upgrade throughout unit. all remodel work in-kind.Details
unit 12. bathroom and kitchen remodel and electrical upgrade throughout unit. all remodel work in-kind. | $30,000 |
| Feb 4, 2020 | Completed final sign-off Jan 2024 | 1901 Balboa St | convert existing 1st floor commerical space to residential use as density conforming unit. new dwelling unit will addd 2 new bedrooms, 1 bathroom, living space, and kitchen.Details
convert existing 1st floor commerical space to residential use as density conforming unit. new dwelling unit will addd 2 new bedrooms, 1 bathroom, living space, and kitchen. | $97,000 |
| Nov 1, 2019 | Completed final sign-off Jul 2020 | 1227 Waller St | kitchen and bathroom remodel; replace tile and plumbing fixtures in bathroom. replace kitchen counters, cabinets and appliances. no structural workDetails
kitchen and bathroom remodel; replace tile and plumbing fixtures in bathroom. replace kitchen counters, cabinets and appliances. no structural work | $35,000 |
| Jun 13, 2019 | Completed final sign-off Aug 2019 | 832 Bay St | kitchen remodel on 2nd floor. remove the extg non bearing wall, open the extg kitchen to living room. remodel one bathroomDetails
kitchen remodel on 2nd floor. remove the extg non bearing wall, open the extg kitchen to living room. remodel one bathroom | $12,000 |
| Jul 24, 2018 | Completed final sign-off Jul 2018 | 141 Moneta Wy | remodel kitchen: replace existing cabinets, replace countertops, sink, faucet and appliances.Details
remodel kitchen: replace existing cabinets, replace countertops, sink, faucet and appliances. | $10,000 |
| Jul 11, 2016 | Completed final sign-off Sep 2016 | 331 Octavia St | unit #6: kitchen and bathroom remodel - new cabinets, new appliances, new plubming fixtures, new tile, new paint upgrade electrical, repair damged walls, etc, (in kind) to comply with n.o.v. 201551614Details
unit #6: kitchen and bathroom remodel - new cabinets, new appliances, new plubming fixtures, new tile, new paint upgrade electrical, repair damged walls, etc, (in kind) to comply with n.o.v. 201551614 | $18,000 |
| Apr 13, 2016 | Completed final sign-off Jun 2016 | 331 Octavia St | unit #23 remodel one bathroom & one kitchen in-kind in unit #23, no new wall & no existing wall relocation. lighting in kitchen & bathroom remodel shall comply with cec 150.0(k)3 & 5. new sheet rock where used shall be 5/8" type x gyp. board.Details
unit #23 remodel one bathroom & one kitchen in-kind in unit #23, no new wall & no existing wall relocation. lighting in kitchen & bathroom remodel shall comply with cec 150.0(k)3 & 5. new sheet rock where used shall be 5/8" type x gyp. board. | $18,000 |
| Feb 10, 2016 | Completed final sign-off May 2016 | 1457 Sanchez St | remodel kitchen install new cabinets new counters, new appliances, new electrical new plumbingm remodel bathroom new tile new fixtures, new gas heaterDetails
remodel kitchen install new cabinets new counters, new appliances, new electrical new plumbingm remodel bathroom new tile new fixtures, new gas heater | $18,000 |
| Dec 1, 2015 | Never finaled issued Dec 2015, no final | 1227 Waller St | kitchen -bathroom remodel. new electrical and new plumbing, new cabinets, new appliances, new fixtures.Details
kitchen -bathroom remodel. new electrical and new plumbing, new cabinets, new appliances, new fixtures. | $25,000 |
| Dec 1, 2015 | Completed final sign-off Feb 2016 | 331 Octavia St | work in unit #1: kitchen and bathroom remodel. new plumbing, new electrical, new cabinets, new appliances, new fixtures.Details
work in unit #1: kitchen and bathroom remodel. new plumbing, new electrical, new cabinets, new appliances, new fixtures. | $16,000 |
| Aug 20, 2015 | Completed final sign-off Nov 2015 | 1227 Waller St | unit #3: remodel kitchen & bathroom, new electrical & plumbing. replace windows & dry rot. 5 windows visible from street & 4 at the back.Details
unit #3: remodel kitchen & bathroom, new electrical & plumbing. replace windows & dry rot. 5 windows visible from street & 4 at the back. | $28,000 |
| Apr 20, 2015 | Completed final sign-off Feb 2016 | 331 Octavia St | unit 3: bathroom & kitchen remodel (replace toilet, bathroom sink, tub & shower valve, new tile, install new fan, new kitchen cabinets, new kitchen floor, new countertop).Details
unit 3: bathroom & kitchen remodel (replace toilet, bathroom sink, tub & shower valve, new tile, install new fan, new kitchen cabinets, new kitchen floor, new countertop). | $14,000 |
| Sep 29, 2014 | Never finaled issued Sep 2014, no final | 2663 Pine St | #1- kitchen & bathroom remodel, new electrical, new plumbing, new paint, new cabinets. no structural work.Details
#1- kitchen & bathroom remodel, new electrical, new plumbing, new paint, new cabinets. no structural work. | $18,000 |
| Aug 26, 2013 | Completed final sign-off Oct 2013 | 1840 Castro St | revise permit #201307242709; replace existing window in kitchen not visible from street, repair dry rot u factor .4Details
revise permit #201307242709; replace existing window in kitchen not visible from street, repair dry rot u factor .4 | $300 |
| Jul 24, 2013 | Never finaled issued Jul 2013, no final | 1840 Castro St | kitchen remodel. update electrical, plumbing, install new cabinets, new tile, new counters.Details
kitchen remodel. update electrical, plumbing, install new cabinets, new tile, new counters. | $12,000 |
| May 15, 2012 | Completed final sign-off Nov 2012 | 144 Capra Wy | replace kitchen cabinets on 2 kitchens, new counter tops new appliances; #144 -remodel 2 bathrms, new tile, new fixtures and #146- remodel 1 bathrm new tile new fixturesDetails
replace kitchen cabinets on 2 kitchens, new counter tops new appliances; #144 -remodel 2 bathrms, new tile, new fixtures and #146- remodel 1 bathrm new tile new fixtures | $67,000 |
| Aug 7, 2008 | Never finaled issued Aug 2008, no final | 145 Edgewood Av | kitchen remodel. replace countertops, kitchen appliances . install some electrical.Details
kitchen remodel. replace countertops, kitchen appliances . install some electrical. | $6,500 |
| Oct 25, 2007 | Completed final sign-off Mar 2008 | 733 Front St | work on unit#603.replace kitchen cbinets, reinstall countertop and kitchen appliances. add lights on ceilings. no structure. min 50% of kitchen light wattage must be fluorescent lights. no window or door work.Details
work on unit#603.replace kitchen cbinets, reinstall countertop and kitchen appliances. add lights on ceilings. no structure. min 50% of kitchen light wattage must be fluorescent lights. no window or door work. | $20,000 |
| Apr 24, 2007 | Completed final sign-off Mar 2008 | 1835 Franklin St | demo kitchen walls - master bedroom closet walls & kitchen ceiling. remodel kitchen and bathrooms, new sheetrock master bath & linen closet. sheetrock where needed - new hardwood floors.Details
demo kitchen walls - master bedroom closet walls & kitchen ceiling. remodel kitchen and bathrooms, new sheetrock master bath & linen closet. sheetrock where needed - new hardwood floors. | $75,000 |
| Jun 23, 2006 | Never finaled issued May 2007, no final | 355 Gambier St | vertical addition on top of back room + kitchen and bath remodel on (e).Details
vertical addition on top of back room + kitchen and bath remodel on (e). | $65,000 |
| Oct 13, 2005 | Never finaled issued Oct 2005, no final | 101 Lombard St | replace bathroom fixtures, bath tile, install new kitchen appliances, repair sheetrock as needed, no structural workDetails
replace bathroom fixtures, bath tile, install new kitchen appliances, repair sheetrock as needed, no structural work | $12,000 |