Back to kitchen remodel contractors
Alvar Bay Construction
- Based in
- Suisun City
- On San Francisco permits
- Apr 2008 to Jun 2018
- Last 24 months
- 0 permits filed
4 permits since 2000: 4 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
2 kitchen remodel permits: 2 completed. Typically 12 days from filing to permit and 278 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 7, 2018 | Completed final sign-off Apr 2019 | 1717 Leavenworth St | kitchen remodel, bath. remove all trim and baseboard. new drywall, new office unit 6, top floorDetails
kitchen remodel, bath. remove all trim and baseboard. new drywall, new office unit 6, top floor | $75,000 |
| Apr 11, 2008 | Completed final sign-off Sep 2008 | 1260 Haight St | unit 6 - replace hold cabinets with new cabinets - faucet counter top. replace existing 4" low u. light with 4" flourecent light (4 total) kitchen remodel unit #6. min 50% of light wall shall be in flourecent.Details
unit 6 - replace hold cabinets with new cabinets - faucet counter top. replace existing 4" low u. light with 4" flourecent light (4 total) kitchen remodel unit #6. min 50% of light wall shall be in flourecent. | $17,000 |