Back to kitchen remodel contractors
Althouse Construction Group Inc
- Based in
- Sonora
- On San Francisco permits
- Sep 2017 to Apr 2018
- Last 24 months
- 0 permits filed
2 permits since 2000: 2 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
1 kitchen remodel permit: 1 completed. Typically 55 days from filing to permit and 30 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 28, 2017 | Completed final sign-off Dec 2017 | 845 Market St | space fe2 ti: bart level- new cabinets, new electrical fixtures, new equipment, some (e) equip to stay. back house kitchen cleaning only (stairs existing). upgrade fire safety devices, add mop sink, hand sink, new front 6" drop ceiling and fixtures. fire safety/sprinklers under sep permit. maher naDetails
space fe2 ti: bart level- new cabinets, new electrical fixtures, new equipment, some (e) equip to stay. back house kitchen cleaning only (stairs existing). upgrade fire safety devices, add mop sink, hand sink, new front 6" drop ceiling and fixtures. fire safety/sprinklers under sep permit. maher na | $120,000 |